ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

$FO.43 6
(3. 8)

JOB NO.

AS-BUILT DRAWING NUMBERS ANO DATES:

20-9001
2/15/51
20-903.1 1/15/51

640 - he

20-353.1 1/15/51
V15/51

AT-( 29-1 }-507

No.: 107 and 222

Quantity

DATE OF THIS REPORT:

15 January 1951

Shop Building and Timber Grease Rack

ou

DESCRIPTION OF PROPERTY UNITS

"Wot for use by A-E

LOCATION RUNIT ISLAND - SITE "C*

The Complete Construction of

Bullding

18H-626.2
*Property
Account

CONTRACT NO.
‘For:

sneer wo. 8 or_20__

ORs

COMPLETION REPORT FOR

Unit

ESTIMATE
Construction
Contract

Estid. Value
Gov.Furnished

Engineerin
Cost
9

Total

SHOP BUILDING - Bldg. $107
One story, double roof, prefabricated eluninus structure; rectangular shape;

sige I.D. 2h'-0" x 1p'-8 1/2" x 10'-0" mean height; vented window panale; benches
and bins; electrical wiring and fixtures; pipings floor area 0.D. 1,05) square
feet; cubic content I.D. 9,770 cubic feet.
Installed equipment includes: One grinder, one drill presse, one sump pump, one
gelvonometer, one tool set, and one elactris drill.

1

Fach

Indirect{

3,651.24

$341.96

$10,834.73

TIMBER GREASE RACK - Hidg. fll

Grease rack of timber construction; overall sise at grade level, 1i'-O" x 2'

3/4", two tread ramps.

i

Rach
Direct
Indirect

$583.59
$18.41

$21,102.00

“This docum
the National I

e

tn aaymann

*Proration
Charges to ofUnits

Select target paragraph3