SFOQ- 430
(3- $0)

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

Saar

COMPLETION REPORT FOR
JOB NO.

AS-BUILT DRAWING NUMBERS AND DATES:

40-365-2
FS-490

4C-616-1
28-132

640 = hf

FS—63
bydwdale

40-615-1

keC-617-1
20-373-1

CONTRACT NO.

For:

LOCATION RUMIT ISLAND = SITE "C*

AT~( 29-1 1-507

g Pee 8

DATE OF THIS REPORT:

23 Mareb 1992

.

ESTIMATE

DESCRIPTION OF PROPERTY UNITS

&

or_20

Bullding No.: 106 = Station 100

hO—b1,5-1

Account
Number

7

"Not for use by Aq

The Complete Construction of Power & Water Distillation Plant

indi2=1

“Property

SHEET NO.

Quantity

Unit

Construction
Contract

Cost

Est'd. Value
Gov. Furnished
Material

Engineering
Cost

Totai

DISTILLATION PLANT

This is « one story reinforced concrete structure with walls and roof slab 17*

thick, floar aleb 6° thick am! concrete masses of various sises for maghinery
and equipment foundations.

There are four hexagon shaped columns measuring 2'-i,"

across the flate supporting the roof slab, and one sessanine deck 15'-2" x i7'8 1/16" with an &* thick reinforced concrete slab. There is a 2'-O" high
parapet 12" thick across the front, and 1)" thick wing-walls extending
diagonally 15'-0" from each corner of the front face of the building. Interior

dimensions of 51'-O" x 2'-O" x 15'-0" high, give an ares of 2,142 square feet

on the sain floor plus 265 square feet on the messanine, end a total content
of 32,130 cubic feet. Three exterior walls and roof are water sealed with 2
layers of 15 pound rag felt, hot mopped, ami structures is earth covered to a
minimus depth of 2'-~O" graded off tao sides and rear at the rate of 1' to 3’.
oomplete with electrical fixtures ani wiring, telephone installation,
three diesel engine driven generators with cubicles end panel boards, pumps, aod
three distillation unite; diesel engine piping, distillation piping, and ventilation equipment and ducts, two air compressors, two air tanks, one chemical
feeder, two fans, one boiler, ome acid tank, ome fuel of] tank, two transformers,
Coste recorded on this sheet do not include equipment installed for generating
electrical power or water distillation. These items are included on sheeta of
their respective system.

$52,257.08

44,9802 71

$1,033.98

$98,271.73

“Proration of

Charges to Units