ATOMIC ENERGY COMMISSION
‘ SANTA, FE OPERATIONS OFFICE

SFO. 43 4

(3. §0)

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND LATES:

3P=563h.1
3P-076
30-086
38-5431
oo |
[sProperty

CONTRACT NO,

JOB NO. O42 = 10

2/24/51
2/24/51
2/2h/s1
2/2b/51

For:

_AT-{ 29-11-50?

LOCATION

The Complete Construction of

Building No.:

ra

ENIWETOK ATOLL

Quantity

res
Unit

a

in

mo

Construction
font ract

-

Not

1

Estid. Value
GO een ished

dp

use

by

STATIC

$827,

fo..

oe
Total

This is a one story wood frame, flat roof and walle covered with sluminum sheet,

1

Raoh
Direct

$6,572073

INSTRUMENT BUILDING, STATION 826, SITE "Pp"

This 1a a one story wood frame, flat roof and walls covered with alumimm sheet,
anchored to a 12" reinforced concrete foundation i'-6" below grade, sise 10'-2 1/2"
x 12'=2 1/2", complete with electric wiring and fixtures and ventilation system.

Installed equipment includes:

One blower fan.

)
1

Each
Direot

Indirect

$2,954.15

2, 769-659

$49.72

—

*Prorati
'
Charges to Unite

ee

SITE "Q"

anchored to a 12" reinforced concrete foundation i,'-6" below grade, sise 10'-2 1/2"
x 12'=-2 1/2", complete with electric wiring and fixtures and ventilation system.
Installed equipment includes: One blower fan.

’

ry

~

Engineerin
cost ag

AMC REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
INSTRUMENT BUILDING,

A-E

2h February 1951

ESTIMATE
.

for

DATE OF THIS REPORT:

Instrument Buildings

Stations No. 827 and 828

| rs
LESCRIPTION OF PROPERTY UNITS

Account

:

$5,773.55