ATOMIC ENERGY COMMISSION
‘ SANTA, FE OPERATIONS OFFICE
SFO. 43 4
(3. §0)
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND LATES:
3P=563h.1
3P-076
30-086
38-5431
oo |
[sProperty
CONTRACT NO,
JOB NO. O42 = 10
2/24/51
2/24/51
2/2h/s1
2/2b/51
For:
_AT-{ 29-11-50?
LOCATION
The Complete Construction of
Building No.:
ra
ENIWETOK ATOLL
Quantity
res
Unit
a
in
mo
Construction
font ract
-
Not
1
Estid. Value
GO een ished
dp
use
by
STATIC
$827,
fo..
oe
Total
This is a one story wood frame, flat roof and walle covered with sluminum sheet,
1
Raoh
Direct
$6,572073
INSTRUMENT BUILDING, STATION 826, SITE "Pp"
This 1a a one story wood frame, flat roof and walls covered with alumimm sheet,
anchored to a 12" reinforced concrete foundation i'-6" below grade, sise 10'-2 1/2"
x 12'=2 1/2", complete with electric wiring and fixtures and ventilation system.
Installed equipment includes:
One blower fan.
)
1
Each
Direot
Indirect
$2,954.15
2, 769-659
$49.72
—
*Prorati
'
Charges to Unite
ee
SITE "Q"
anchored to a 12" reinforced concrete foundation i,'-6" below grade, sise 10'-2 1/2"
x 12'=-2 1/2", complete with electric wiring and fixtures and ventilation system.
Installed equipment includes: One blower fan.
’
ry
~
Engineerin
cost ag
AMC REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
INSTRUMENT BUILDING,
A-E
2h February 1951
ESTIMATE
.
for
DATE OF THIS REPORT:
Instrument Buildings
Stations No. 827 and 828
| rs
LESCRIPTION OF PROPERTY UNITS
Account
:
$5,773.55