ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

Sleat

COMPLETION REPORT FOR

AS-BUIL | DRAWING NUMBERS AND GATES:

JOB NO.

3E-5632.1 3/9/51
3B-076
a

G62 = 10

3/9/52

for.

aa

33/3

CUNTRACT NO, —AT-1 29-1)-507

LOCATON

The Camplete Construction of
Building No.:

Account

DESCRIPTION OF PROPERTY UNITS

EMIWETOK ATOLL

NO

103 of.

“Not

tor use By A-E

DATE

OF

FHIS REPORT:

9 March 1951

Instrument Buildings

Stations No, 825 and 826
.

“Property

SHEET

Quantity

Unit

Number
pe

.

nn _.

Constru tion
Contract
Cust
—

|

—+

tst'd.
uovw.

—{

Value

Furnished

Materia!

—

Engineering
Bost

a

Total

AMS REQUIRED CONSTRUCTION AMD LOCATION OF THE FOLLOWING STATIONS:
DIISTRUMEMT BUILDING,

STATION

#825,

SITE

“&*

A reinforced concrete structure, sise 0.D. 10'-8" x 12!'-8" x 9t-2" with 1'-4,"

walls, floor, and roof set 5'-O" below grade with ramp to entrance and earth
banked to the roof, complete with electric wiring and fixtures, underground
conduit to junction boxes, explosion diir, work bench and rack, and ventilation.
Installed equipmemt includes: One fan.

Zach

Direct

$6,962.61

Direct

05,097 266

Indirect.

4, Bk2.02

$122,01,

$11,946.67

$87.41

$9,395.70

INSTHUMENT BUILDING, STATION #626, SITE "3"

A reinforced concrete structure, aise 0.D. 10'=-0" x 12'-0" x 8'-6" with 12° walla,
floor and roof, set l'-6" below grade with remp to entrance, complete with
electric wiring md fixtures, underground conduit to junction boxes, explagion
door, work bench and rack, and ventilation.

One fene

.

Installed equipment includes:

hy 21063

.

Proration

of

(Narges to Units