SFO. 434
(3-50)
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
Sleat
COMPLETION REPORT FOR
AS-BUIL | DRAWING NUMBERS AND GATES:
JOB NO.
3E-5632.1 3/9/51
3B-076
a
G62 = 10
3/9/52
for.
aa
33/3
CUNTRACT NO, —AT-1 29-1)-507
LOCATON
The Camplete Construction of
Building No.:
Account
DESCRIPTION OF PROPERTY UNITS
EMIWETOK ATOLL
NO
103 of.
“Not
tor use By A-E
DATE
OF
FHIS REPORT:
9 March 1951
Instrument Buildings
Stations No, 825 and 826
.
“Property
SHEET
Quantity
Unit
Number
pe
.
nn _.
Constru tion
Contract
Cust
—
|
—+
tst'd.
uovw.
—{
Value
Furnished
Materia!
—
Engineering
Bost
a
Total
AMS REQUIRED CONSTRUCTION AMD LOCATION OF THE FOLLOWING STATIONS:
DIISTRUMEMT BUILDING,
STATION
#825,
SITE
“&*
A reinforced concrete structure, sise 0.D. 10'-8" x 12!'-8" x 9t-2" with 1'-4,"
walls, floor, and roof set 5'-O" below grade with ramp to entrance and earth
banked to the roof, complete with electric wiring and fixtures, underground
conduit to junction boxes, explosion diir, work bench and rack, and ventilation.
Installed equipmemt includes: One fan.
Zach
Direct
$6,962.61
Direct
05,097 266
Indirect.
4, Bk2.02
$122,01,
$11,946.67
$87.41
$9,395.70
INSTHUMENT BUILDING, STATION #626, SITE "3"
A reinforced concrete structure, aise 0.D. 10'=-0" x 12'-0" x 8'-6" with 12° walla,
floor and roof, set l'-6" below grade with remp to entrance, complete with
electric wiring md fixtures, underground conduit to junction boxes, explagion
door, work bench and rack, and ventilation.
One fene
.
Installed equipment includes:
hy 21063
.
Proration
of
(Narges to Units