ATOMIC ENERGY COMMISSION
yas
SANTA
FE
OPERATIONS
OFFICE
Whe...
sneer no 9G of,
COMPLETION REPORT FOR
Sorte
3E-5684
tw AWI NG NEIMeR
1
ey
waren 1
3E-~5697 |
BE-5448
eet
4/2/51
4/2/51
[oar cunt
|
|
|
CONTRACT NO,
For:
AT-( 29-1}-507 _
The ‘omplete Construction of
'
LUCATION ENIWETOK ATOLL
Eko RE PTION OF PROPERTY UNITS
Quantity
Unit
Construction
Contract
Tost
|
A reinforced limonite concrete structure sise 0,D, 14'-0" x 14'-6" x 14'-O" high,
humidification,
1
foul,
4
ESTIMATE
value
Gov. Furnished
Material
_
_.
_
Engineering
Cost
{
-
Total
— ,
Each
$1,816,05
(§62,856,47
642,15
35,364.07
A reinforced limonite concrete structure sise 0,D, 14'-O8 x 14'-6" x 14'-0" high,
1
Each
Direct
A-E
PF
GANEX LIMONITE BLOCKHOUSE,STATION WO, 144a ON SITE “EM
provides one room in the center, aise I,D, 4'-O" x 6'-O" ¢ 7'=-0" to ceiling, with
one wall open and barricade, later to be closed with 772 limonite cubes, size
7 7/8" x 7 7/8" x 7 7/8", opposite wall containa a steel 16 tube alignment rack,
electric wiring and fixtures, and underground piping from Station 1445 for debumidification,
by
2 april 1951
provides one room in the center, sise I.D, 4'-0" x 6'-O" x 7'=0" to ceiling, with
one wall open and barricade, later to be closed with 772 limonite cubes, sise
77/8" x 7 7/8" x 7 7/8", opposite wall contains a steel 16 tube alignment rack,
electric wiring and fixtures, and umlerground piping from Station lidb for de-
Direct
$49,353,53
Indirect 11,686,89
|
use
IHLS REPORT:
p
UCRL AND WRLK REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
GANEX LIMONITE BLOCKHOUSE, STATION NO, 144a ON SITE "D - ¥®
for
,
_
_
a
.
Not
DATE OF
Ganex Lisonite Blcokhouse
Building No.: Station No, 14a
I
|
|
F729 = 26
Nmibe r
|
|
JOB NO.
2/51
Weer 2
ert, |
BNE LATE:
.
21, 508,78
Indirect 13,213,14
a
“Proration of
Charges to units
Po
_