ATOMIC ENERGY COMMISSION

yas

SANTA

FE

OPERATIONS

OFFICE

Whe...

sneer no 9G of,

COMPLETION REPORT FOR
Sorte

3E-5684

tw AWI NG NEIMeR

1

ey

waren 1
3E-~5697 |
BE-5448

eet
4/2/51
4/2/51

[oar cunt

|

|

|

CONTRACT NO,
For:

AT-( 29-1}-507 _

The ‘omplete Construction of

'

LUCATION ENIWETOK ATOLL

Eko RE PTION OF PROPERTY UNITS

Quantity

Unit

Construction

Contract
Tost

|

A reinforced limonite concrete structure sise 0,D, 14'-0" x 14'-6" x 14'-O" high,

humidification,

1

foul,

4

ESTIMATE
value

Gov. Furnished
Material

_

_.
_

Engineering

Cost

{

-

Total

— ,

Each

$1,816,05

(§62,856,47

642,15

35,364.07

A reinforced limonite concrete structure sise 0,D, 14'-O8 x 14'-6" x 14'-0" high,

1

Each
Direct

A-E

PF

GANEX LIMONITE BLOCKHOUSE,STATION WO, 144a ON SITE “EM
provides one room in the center, aise I,D, 4'-O" x 6'-O" ¢ 7'=-0" to ceiling, with
one wall open and barricade, later to be closed with 772 limonite cubes, size
7 7/8" x 7 7/8" x 7 7/8", opposite wall containa a steel 16 tube alignment rack,
electric wiring and fixtures, and underground piping from Station 1445 for debumidification,

by

2 april 1951

provides one room in the center, sise I.D, 4'-0" x 6'-O" x 7'=0" to ceiling, with
one wall open and barricade, later to be closed with 772 limonite cubes, sise

77/8" x 7 7/8" x 7 7/8", opposite wall contains a steel 16 tube alignment rack,
electric wiring and fixtures, and umlerground piping from Station lidb for de-

Direct
$49,353,53
Indirect 11,686,89

|

use

IHLS REPORT:

p

UCRL AND WRLK REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
GANEX LIMONITE BLOCKHOUSE, STATION NO, 144a ON SITE "D - ¥®

for

,

_
_
a
.

Not

DATE OF

Ganex Lisonite Blcokhouse

Building No.: Station No, 14a

I

|

|

F729 = 26

Nmibe r

|
|

JOB NO.

2/51

Weer 2

ert, |

BNE LATE:

.

21, 508,78

Indirect 13,213,14

a
“Proration of

Charges to units

Po

_

Select target paragraph3