ATOMIC
Sh
(3

SANTA

au
501

ENERGY

FE

COMMISSION

OPERATIONS

qe

OFFICE

COMPLETION REPORT FOR
sah!

3E-5670

3E-081

4/2/51

eas

%G-5651,6

lov ho)

Blayney

3/9/51

3-080

3/9/51

G-5653

3/9/51

3G-5437

729 = 26

typhi

3/9/51

ie

building MO..

LooaAce

tes

tT, L.

ot

phEET
"Nor

. ENIWETOR ATOLL

Se

Nw

te

de

rotted]

the

fet

Beate ure de

2A pril 1951

Pit

Station No, 143

:
be

t

HOR ROPE RI Y

UNIT

Koearhity

tha.

.abae

hoyrtiy

bee.

tied

UCRL AND MRLK REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:

T,L, PIT,STATION NO, 143 ON SITE “E®*
A reinforoed concrete connection pit, size I,D, 10'-0" x 16'-O" x5'-3" deep,
8" floor slab and walls, with ramp to Station 141 and trench to base of

tower, 8
pump, 4 12" thick reinforced concrete retaining wal) 5'-3" high
xX 25'-9 1/4" long, with reinforced concrete foundation, ip attched to pit, A
4" concrete side walk, 3'-O" wide x 31'-0O" long beteeen retaining wall and

Staticn Lila and b complete with electric wiring and fixtures and piping,

Each
Direct
Indirect

$4,910, 80
4,146,10

$190,21

$9,253,11

241,53

11, 567,82

T,L. PIT, STATION NO, 143 ON SITE "D = VF"

a4 reinforced concrete connection pit, size 1,D, 11'-0" x 161-9" x 51-3" depth
8* floor slab with 8" walla, with ramp to Station ljla, tunnel opening to tower

base, sump pump and plumbing, and electric wiring and fixtures,

Fach
Direct
Indirect

5, 528,81

5,797 48

fat

Poas ye

Waters al

yor

t.

vt
Hirt