ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 430
(3.50)

AS-BuiLT

eS...

COMPLETION REPORT FOR
ORAWIN., NUMBERS

38-5674,

2/15/51

JOW NO.

AND DATES:

CONTRACT NO,

729 = 19
For:

AT-(29-11-507

The Complete Construction of

LOCATION

SHEET no. 68 oF_

"Not for use by A-E
DATE

EMIWBPOK ATOLL

OF

THIS REPORT?

15 February 1951

Collimator Base

Stations 9

Huitding No.:

aETMATE
a

"Property
Account
Number

LESCRIPTION OF

PROPERTY UNITS

Quantity

|construction | Est'd. Value
init

Cont raut

Last

Gov.

7

Furnished

Material

a

ay en

Engineering

Cost

Total

—

MRL, REQUIRED CONSTRUCTION AMD LOCATION OF TRE FOLLOWING STATIONS:

COLLIMATOR BASE, STATION NO, 9 ON SITE "D - ¥*
Retaforeed eonarete base 9'~-D" x 91-0" x 4'-0" below grade, Structural steel
above grade, anahored to bese and
means for edjusting amd clamping
collimatey blogks into proper position, Collimstor bloaks furnished by others,

2

Bach

Direct

Indirect

$4,424.28

3,440, 98

$ 88,27

$7,953.53

5,423,086
3, 252,28

113,56

8,788.92

COLLIMATOR BASE, STATION NO, 9 OM SITE "E®
Reinforced concrete base 9'~O" x 91-08 x 4'<0" below grede,

Structaral steel

above grade, anchored to base and providing means for adjusting and clamping
collimator blooks into proper position, Collimator bloeke furnished by others,

i

Each
Direct
indireat

*Proration of

Charges to units

Select target paragraph3