ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO-.~30a

13-50)

AS-dUTL)

COMPLETION REPORT FOR
DRAWING NUMBER,

3E-5673,2

3/9/51

JOB NO,

ANU DATES:

CONTRACT NO. AT-1 29-1 )-h07

F29 = 19
For:

‘ee
LUCATION

sueeT no

__©7

"Not for use by A-E
DATE OF THIS REPORT:

EMIMETOK ATOLL

9 March 1951

The Complete Construction of Gollimator Base
Bbuitding No.: Station 8

7

ESTIMATE

Accuunt
Number

|
|

|

rESte REPTION OF

Quantity

PROPERTY UNITS

t'd. value
Furnished
Material

fonstrua tion

bs

Contras t

"UV,

Ss

Engineering
Cast

”

Total

f}$—__—--~— -_-_ .. -]

.

Proration ot
Charges to Units

|

B,R.L, REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
COLLIMATOR BASE, STATICN 8 OM SITE "D - ¥®
Reinforced consrete base 22'-0" x 9'~O* x4'-0" below grade,

above grade, anchored te base ani
oollimator blooke into proper position,

Structural steel

means for adjusting and clamping
Collimator blecks furnished by others,

Bach
Direct
Indirect

#,018, 56

3,553,458

$130,95

$9,702.99

7,463,812
3,676, 01

162,68

11, 302,50

COLLIMATOR BaSE, STATION & OM SITE "D - ¥"
Reinforced concrete base 22°-0* x 9'=08 x 4'-0" below grade, Structural steel
above grade, anchored to base and
ing means fro adjusting and clamping
eollimater blooks into proper position, Collisater blocks furnished by others,
Direct
Indrest

5

"PrUperty

or.

C

Thia dooume

pe Natty...

Arm ation Affecting

Emec Keates dey
wet

if ite CORtente

Mi here pateon ie

f° fet ev ere stiming?
he hitorgd Laws,”

Select target paragraph3