COMPLETION REPORT FOR
36-698 1
3G=5425
HG-O7 3-1

/en/s.
1/27/51
2/2/51
2/15/51

PUNTRACT NGS, AaT-29--i9-5U7
38-689
JEOTK
38-5420

2/21/51
2/21/51
2/21/51

For:

Oy

CONSTRUCT.

D

AT

ob

IO

0

ERIWE?TOK ATOLL

20a thru f, Zla thru o, 238 and b, 25

No,

ne

Pek pe TY UN Te

t

LOCATION

"Not

for

GOATt

OF

ee
Conmstrur tian

wuantity

tinagt

fortra t

if

by

t

eee

Engineering
toast

{

--+--

Total
4

CUMCRETE BLAST BUILDING, STATION NO, 23a AND b, SITE “B®
STATION 238

23b, a one story reinforosd concrete structure, sise outside dimensions, 17'-0" x
10'-O* x 8-10" high, including 8" floor, 12° walls, and 14% thick ceiling, anchored
to foundation footings 2'-6" wide x 1'=4" thick, cubic contents 840 cubic feet,
floor area 120 square feet, attached to the existing structure 23a which has been
reconditioned and modified, including new openings, 2'-2" x 6'-6" passageway to
23>, *unistrut” inserts surface mounted in walls and ceiling, air conditioning,
electric wiring ant fixtures, and telephones services, The structures have an earth
backfill to the roof around three sides, Installed equipment includes one fan,

1

Direct
$6,932.01
Indirect; 6,461.54

$312,63

$13,706,18

846,53
313,93

45,41

1,265, 87

STaTION 23b
23d, a one atory reinforced concrete structure, aise ourside dimensions, 17'-O° x

10'-0" xz 8'=10" high, including 8* floor, 12° walls, and 14" thick ceiling, anchored
to foundation footings 2'-6" wide x 1'-4" thick, cubic contents 440 cubio feet,
floor area 120 square feet, attached to the existing structure 23a which has been
reconditioned and modified, including new openings, 2'-2" x 6'-6" passageway to
2%, "onistrut" inserts surface sncunted in walle and ceiling, air sonditioning,
electric wiring and fixtures, and telephone services, The structures have an earth

backfill to the roof around three sides,

Direct
Indireot

|

“Tre

MAT,

|

AE

i sTiMAtTe

tatid. value
burnished
Material

saw,

use

THIS REPORT:

2 April 1951

omplete Construction of Blast Buildings