ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO.43 a

(3. 50)

AS-BUILT

COMPLETION REPORT FOR
JOB NO,

DRAWING NUMBERS ANO DATES:

Mae 176-808 ait

VaVar

17-807

17G=804

1/31/51

3¢-627,2 2/10/51
:

ae

I*property|

Recount
Number

CONTRACT NO.

For:

vaya

170-802

mee

729 + 15

AT-( 29-1 )-507

?

lee
LOCATION

*Not for use by A-E
DATE OF TH

EMIWETOK ATOLL

s

Building No.: Stations 20a thru f, 21a thru o, 23a and b, 25
ESTIMATE
Unit

DESCRIPTION OF PROPERTY UNITS

Construction

Contract
Cost

.

.

Engineering
Cost

BLAST WALL STATION NO, 20a THRU f, SITE "C*
Two reinforced concrete walls, 10'-6" x 5t~O" x 1'-0", on reinforced soncrete
foubdation 4'-0" x 334-0" x 2'-9", Steel field panel S'-0" x 51-0" x 11-08

Conduit sleeves, eto,

Fach
Direct
Indirect

At
|

|

0,

REPORF:

The Complete Construction of Blast Buildings

NOBL REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:

betwen walla,

OF

208

$27, 595,34
11,034,09

$1,471,01

28 344,25
11,877.63

1,482,89

nEe

Two reinforced concrete walls, 10'-6" x 5'-0" x 1'=0", on reinforoed concrete
foundation 41-0" x 33'-0" x 21-9" Steel field panel 8'-O0" x 51-08 x 1'=0"
between walla, Conduit sleeves, eto,

Each

Direct
Indirest]
BLAST WALL STATION NO, 2la THRU o, SITE "E*
Two reinforced concrete walla, 101-6" x 5'-0" x 1'-0", on reinforced concrete

foundation 4'-0" x 33'~0" x 2t-9", Steel field panel S'-0" x 5'-0" x 1'=08
between walls, Conduit sleeves, etc,
;

Each

Direot

Indirect

14,481.72

6,040,47

758,99

242,82
3,036.46

142,43

CONGRETE BLAST BUILDING, STATION 23a, SITE "C"
Existing reinforced concrete structure rehabilitated and added ventilation and
electrical, backfill, Inetalled equipgent includes one fan,

Each
Direct
Indirect

CONCRETE BLAST BUILDING, STATION NO, 23a, SITE "D - V"
An existing reinforced concrete structure rehabilitated, added ventilation,

electric wiring and fixtures, telephone installation and backfill,
includes one fan,

Equipment

;

Each

Direct

Indirect

2, ile

2,863,

108,06

*

Proration of |
Charges to Units