_ --ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 434
(3- §0)

AS-BUITLT ORAWING NUMBERS AND DATES:

-5u49

4/2/51

JOB NO,

729 - 25

CONTRACT NO.
For:

The Complete

AT=1 29-1 )-bU7_
Construction of

Huilaing No.:

“Property
Number

po Se
a

Unit

Construs tion
Contra: t
sunt

abe ee

a

ALL USERS REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
CABLE TERMINALS, STATION NO, 101 ON SITE "F*

|

Thies is a one «

» shed roof, wood and corrugated aluminum building, sise 0.D,

B'-7 1/49 x 6-7 1/4" x 6'-3" high (mean), set on concrete curb and footing, earth

floor, Complete with telephone, cabinet, switch board and wiring, floor area
O.D, 76 square feet,

1

CABLE TERMINALS, STATION HO, 10] OW SITE "8"
This is a one story, shed roof, wood and corrugated aluminum building, sise 0,D,

B'~7 1/4" x Bt-7 Vie x 61.38 high (mean), set on concrete curb and footing, earth

floor, Complete with telephone, cabinet, ewiteh board and wiring, floor area
0,D, 16 equare feet,

1

CABLE TERMINALS, STATION NO, 101 GH SITE "T*
This ie a one etory, shed roof, wood and corrugated aluminum building, size .0,D,

Sto) 1/49 x 81-7 1/4" x 8'.3" high (mean), eet on concrete curb and footing, earth
floor, Complete witb telephone, cabinet, ewitoh board and wiring, floor area
0,D, 16 equare feet,

1

CABLES TERMINALS, STaTIOW NO, 10] OM SITE "U*
Thie is a one story, shed roof, wood and corrugated aluminum building, sise 0,D,

B'~7 1/4" x Bt-7 1/4e x 81-38 high (mean), set on concrete ourb and footing, earth
floor, Complete with telephone, cabinet, ewitoh board and wiring, floor area
0.D, 1% square feet,

*® COSTS DISTRIBUTED TO aL USERS

1

Each

*

use

Dy

A-E

2 April 1951

IMATE
a

tottd. Vatue
wOov. Furnished
Material

TT mo

for

OF LL.

bale OF THe REPORT:

EMJWETOK aTOLL

Cable Terminal

-

Quantity

Account

“wot

(LOCATION

Station No, 10)

yo

SHEET NO, 29

S

COMPLETION REPORT FOR

Engineering
Cost

Tutal
wks

"Proratiun

Charges

aft

to Unit

Select target paragraph3