The Complete Construction of Pig and Dog Cylinders, Heavy Doge Exposure
Burlding No.:

@@

THIS REPORT:

15 February 1951

4

Chambere, and Veutron Hemisphere Locations.

STATIONS 83a and >, She Thru f, 45a Thru f,

ESTIMATE

lt broperty

Accaunt

| OO

;

a

Number

/

DESCRIPTION OF PROPERTY UNITS

-

_

-

Quantity

.

Unit

Construction

Contra, t

_

alte

vane

Ov aterial °

Engineering

Cost

Total

_

MD REQUIRED CONSTRUCTION AND LOCATIONS OF THE POLLOWING STATIONS:

PIG AMD DOG CYLINDER STATIONS 830 and b, ON SITE “Z"
A station consists of 12 reinforced concrete slabs; accurately located, size

13'<0" x 10'-0" x 1'-0" thick, top surface ons inch above grade, for mounting
oylinders furnished by others, total concrete for station 56 oubio yards,

2

each

Direct
Indirect

$9,373.37
7,965.96

$366.89

$17,706.22

$678.76

26.23

1,124.71

21.51

1,108.33

HEAVY DOSE EXPOSURE CHAMBER STATIONS Gle Thru f, ON SITE "Eg"

& concrete slab accurately located, eise 1'-6" z 5'=-0" x 1'-0" level wth and
below grade. Below surface andi protruding 6” from one end of the slab, there
fe a L* dia. 1.P.8. aluminum alloy pipe oapped both ends with standard iron

pipe oape,

6

each
Direot

Indir ect

hig.72

WEUTROW HEMISPHERE LOCATIONS, STATIONS 85a Thru f, ON SITE "5"
Bound hole in ground ,'-0" die. x 4'-0" deep.
installed by H, & I,

Equipment furnished by User anf

MOT

6

each

Dir eot

602.98

Indi reot

783 8;

r

*Proration of

Charges to Unite