SFO.43 0

(3. $0)

ATOMIC ENERGY COMMISSION
"SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR

AS-BUILT

DRAWING NUMBERS AND DATES:

60-09-11

(3 aheets)

JOB NO. 730.1 - &

2/14/51

CONTRACT NO.
For:

AT~( 29-1) )-507

SHEET NO.

poe

OF.

ig _

"Not for use by A-E
DATE OF THiS REPORT:
ls February 1951

LOCATION ENGEB] ISLAND - SITE "8"

The Complete Construction of Underground Test Shelter
Building Now:

2

Joh?

ESTIMATE
"property

Account

b--

DESCRIPTION OF PROPERTY UNITS

Quantity

This Underground Shelter is» sade up of a enin reinforced concrete structure
109-0" x 10°'-0" x 35'-0" long, Access to and egress from the mein shelter
ie provided by a tunnel 10'-0* x 10'-0* x 56'-0", Opposite the main shelter
and at right angles to the access tunne] is constructed an additional shelter
made up of pre-cast concrete pipe and corrugated iron pipe 101-0" in diameter
by 35'-0° in length, These total structures are covered with a 6'-O" compacted
earth f111, These structures cover a total of 1,260 square feet,

1

Unit

Construction

Contract

Estid.

Value
Gov.Furnished

Engineering

Cost

Total .

-O-

$42, 516,36

"Prorati
f
Charges1onto oO Units

> a

TEST

Instromentation

Tote] Structure and Instrumentation

eb
Direct
Indirect

$26,064.80
16,451,56

Direct
Indirect

12,411,399
13,347.39

Direct

Indirect

38,476.19

29,798.95

$4,263 ,07

30,041.85

4,283 07

72,558 21

CAUTION