ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO.43 0
(3.50)

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS ANG GATES:

60-09-06 (13 sheets)
Fs - 631
2E~0617
NOTE:

JOB NO.

730,1 = 9a

2/14/51
4/18/51
4/19/51

CONTRACT NO.

For:

Sarees.
LOCATION ENGEBI ISLAND - SITE “E*"

AT-( 29-1 }-507

DATE OF

Tne Complete Construction of Multi-Story Bullding
Building Now:

2h

2

or_ lB

THIS REPORT:

19 april 1951

23 Angust 1951 - Revised
ESTIMATE

Sheets No, 2,6,8,10,11,12 revieed 4/18/51

[property
Account

SHEET NO.

*Not for use by A-E

Quantity

DESCRIPTION OF PROPERTY UNITS

unit

Construction
Contract

Each
Direct
Indirect

$557,711,69
466,064,17

Est'd. Value
;
Gove ie ralshed

Engi
;
Ngineerin
3
Coat

tore
.
roration
of
rges to Units
Che

Total

-stony
This ie a three story test structure of concrete, steel and brick, sise 195'-0*

wide x 529-0" deep x 36'-O0" high to the top of the flat roofs and the width
divided into seven separate sections or buildings, A 3" space and sealing connections are provided between al) section foundations, flocr elabs, walls, and

roofe, Well panels, roofs, floors and anchoring to foundation footings are of
various kinds, types, sizes and eombinations to cbtein comprehensive test results,

:

Survey and control points are located in al] outeide walle and foundations, The
second and third floors of buildings Wos, 2, 3, 4, 5 & 6 are live loaded to
100 per square foot with sandbags, Accessways are covered with 4" x 4" timber,

Buildings Nos, 1 and 7 — Drawing Sheets Nos, 1, 2, 3, 4, 5 and 13 - end seal

and test pane] sections, three story are similar in sise, 32'-O" wide x 52'-0*

deep x 36'-O" high,

Buildinge Moe, 2 and 6 — Drawing Sheets Nos, 1, 6, 7, & and 13 - structural
ateel frame, with and without windows, three story are similar in sise, 19'-]"
wide x 52'-08 deep x 36'-O" high,
Buildings Woe, 3 and 5 — Drawing Sheets Nos, 1, 9, 10, 11, 12 and 13 - reinforced
concrete frame, with and without windows, three atory are similar in sise, 19'-1"

wide x 52'-0" deep x 36'-0" high,

Building No, 4 - Drawing Sheets Nos, 1, 10, 11, 12 and 13 - reinforced concrete
frame with shear walle, with floor and roof diaphrams - no windows, sise 53'-0"
wide x 52'-O8 deep x 36-08 high,
Twelve 2" diameter pipes are pounted in wertical position flush with paving to
provide means for making deformation seasurenents,

1

©.
no
rte fhte fed Frat Le ars
-0-

$1,023,775 a6)

1,221,981, 82

Instrumentation

Direat

78,652.48

Total Structure and Instrumentation

Direot

636, 364,27

547,655.09

37,962.56

Direct
Indirect;

308 616,72
334,393,58

-0-

Direct
Indirect!

944,980.89
882,048,67

Grouting Program
GRAND TOTAL
T

Indirect}

*

37 ,962,56

643,010, 30
1,864,992 12

Select target paragraph3