ATOMIC ENERGY COMMISSION TIONS OFFIC E SANTA FE OPERATIO FOR REPORT COMPLETION JOB NO. 640 - Ta AS-BUullLT DRAWING NUMBERS AND DATES: CONTRACT NO, For: AT-( 29-1 )~507 oo. ; SY a 88oraT “Not for use by A-E LOCATION BOGALLUA ISLAND - SITE "F* BATE OF THIS REPORT: The Complete Construction of Site Preparation, Engineering Design, & Building No.: Preliminary Work ESTIMATE DESCRIPTION OF PROPERTY UNITS Quantity unit Construction Contract Estid. Value OOMteeta Engineering Cost Total Fiald Sketches #77 and #83 may be used as reference far the preliminary wrk and materials which have been reported as follows: (1) Blade & Shape (2) Control & Signal Cable (3) Pier (4) Air Strip Matting 50' x 900' (5S) Breakwater (6) Channel (7) Commnication System including 240,000 sqe ft. 78,750 lineal feet 20 foot 5,000 sq. ft. 1,300 feet Direct Indirect $1,097.36 1,194.17 $23.91 $2,715-b4 Indirect 1,118.3 431.3h 5,888.12 33.60 1,055.05 412.56 17 9395093 31.07 1,716.3 $20.54 $20.54 $651.56 $651.56 $1,190.63 $2,190.63 Direct Direct Indirect 743278 277-67 Direct Indirect Direct Indirect! 12,939.56 4,043.81 738 42 946.87 Direct 19,149.53 Direct Submarine Cable yy 338.35 415.58 Considerable preliminary work was involved however, original plans were never completed and no As-Built drawings are submitted. The survey department reports that due to shifting sande and attempts to control same being unsucceseful the project waa abamioned. The following are features which were not constructed but to which design charges are applicable: 200 foot tower Water Facilities Electrical Facilities “This document, ae T * &@ the Nutional | irprsminshin a inal! es *Proration of Charges to Units