SFO. 430

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR

JOB NO.

AS-BUILT DRAWING NUMBERS AND DATES:
l-k79 12/23/50
21-963 12/23/50
tiaoe

ae

L480

For:

YES

4L-003 12/23/50

L961 12/23/50

WL-h77 12/23/50

6375 10/16/50 - 5/7/51 - Revised

bl-OOk 12/23/50

Wyle 12/29/50
"Property

CONTRACT NO.

640 - 3m

L-962- 12/23/50

The Complete Construction of

Buliding No.:

DESCRIPTION OF PROPERTY UNITS

Revised:

Unit

Construction

Contract
Cost

Est'd. Value

Gov. Furnished]
Material

1950

7 May 1952

ESTIMATE
Quantity

F

3

Electrical Overhead Distribution System and

Outdoor Substation

fileA 6/50.

Account
Number

"Not for usd¥by ALE
DATE OF THIS REPORT:
23 December 1

LOCATION JAPTAN ISLAND - SITE "L"

_AT-( 29-1 1-507

.

Erg! neering

Total

$456.56

$22,040.79

$1, 280.90

$47,169.72

Cost

ELECTRICAL OVERHEAD DISTRIBUTION SYSTEM
Thie system consists of 2400 volt primary and 120 - 240 volt secondary conductors
overhead; supported by poles, croes arms, and fixtures, spaced approximately 115
feet apart; 19 transformers; platforms; and drop services.

GOMDUCTORS - Overhead - Sise # 1/0 - Secondary
Size #4

Sise
Sise
Size
Size

#4
#6
#6
#10

—- Primary

=
-

Secondary
Secondery
Secondary & Street Lights
Secondary

POLE ASSEMBLIES - Average length 10 feet
STREET LIGHTING FIXTURES (on distribution poles)

SERVICES - Overhead - 2 Conductor
3 Conductor

Conductor

200

L.F.

S00
2,00
7600
150

L.F.
L.F.
L.F.
L.F.

27

Each

4700

L.F.

7

Each

37

Each

9

Each

i

Each

Direct

Indirect;

$13,381.02

8,203.21

OUTPOOR SUBSTATION

South of Power Plant Building; consists of 6" thick reinforced concrete slab
5°~0" x 19'-9", with conduit rack for power feeders and distribution. Equipment
inoludes:

Six transforsers; grounding system of two ground rods and 20 feet of

#1/0 ground wire; and a fence enclosing Substation Area, &'-O" high, 65 lin. ft.
of chain link type including |,'-0" gate.

1

Each

Direct

Indirect]

$33,765.02

12,123.80