COMPLETION REPORT FOR
JOB NO.

AS-BUILT DRAWING NUMBERS AND DATES:

FS-365-1
FS-365-2

2/24/51

640

2/24/51

CONTRACT NO.
For:

AT—4 29-1 }-507

LOCATION

PARRY ISLAMD - SITE "B*

No.:

OF.

68

4

DATE OF THIS REPORT:

The Complete Construction of Beach Houses
Buliding

?

«Page 147
"Not for us@ by AE
2h February 1951

151 and 152

ESTIMATE
“Property

od

DESCRIPTION OF PROPERTY UNITS

‘Number

Quantit
.
”

fo

Unit

Construction

Contract
Cost

Est'd,

Value

Gov. Furnished
‘Material

Engineerin

eriag
Cost

Total
°

BEACH HOUSES
Thies is a one story wood frame, shed roof of felt composition, sheet metal siding,
erected on a 6" concrete slab 32'-0" x 47'-O0" which includes an 6'-O" terrace,

total floor area 1,50 square feet, complete with electric wiring and fixtures,

end fresh and salt water plumbing.
Installed equipment includes:

Une 20 cubic foot refrigerator in Bldg. #151;

and one 40 cubic foot refrigerator in Bldg. #152.

2
1

TOTAL COST

2

Each
Each

Direct
Indirect

$5,695.83
5,212.07

Unites

$230.57

$11,316.47