ATOMIC ENERGY COMMISSION

SANTA FE OPERATIONS OFFICE

SFO. 430
(3. 50)

AS-BUILT

a

COMPLETION REPORT FOR
JOB NO.

ORAWING NUMBERS AND DATES:

640

CONTRACT NO,

F.S. = 120

For:

AT-i 29-i )-507

"Not for use by A-E

Page 142

DATE OF THIS REPORT:

LOCATION PARRY ISLAND - SITE "B*

The Complete Construction of
Building No.:

sweet wo. 8 oF48

Garbage Can Wash House

150

ESTIMATE
“py

rt

Account
Number

DESCRIPTION OF PROPERTY UNITS

Quantity

Unit

Construction

Contract
Cost

Est'd. Value

Gov. Furnished
Material

.

Engineering

Total

GARJAGE CAN AASH HOUSE - Building #150
One story wood construction; rectangular shape; sise 0.D. 10'-5 1/l" x 10'-8 3/4"
x 10'=0"; set on 6" x 6" concrete curb on 5" thick reinforced concrete slab,

10'=7 1/4" x 1h'-10 3/l", elewated h'-O" above grade; slab on compacted sand fill
and concrete retaining walls; concrete ramp - '-O" = 10'-O" from grade to floor

elevation; floor sloped to drainage pit at end of building.

framing with 3/4" plywood to a height of 4'-0" above curbing.

Walls 2" x 4"

Upper portion of

walls of insect proof plastic screen. Roof 2" x i" rafters, 1" x 6" purlins
and corrugated aluminum roofing. Electric service; plumbing and steam piping.
Floor area 158 square feet; cubic contents 910 cubic feet; ramp area 0 square
feet.

1

Each
Direct.

Indirect

Sarr

$1,582.10

1,888.62

$3,771.02

*