ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 436
(3.90)

2B~132

3/23/51

WG~615-3 3/23/51
FS-478
3/23/52

We-417-2 3/23/51
_—WD-37]_
3/2
"Property
Account
Number

3/23/51

20-373-3 3423/51
P8473
-3/23/51

4~365-3

3/23/51

bola5~3 3/23/50

CONTRACT NO,

pte

AS-BUILT DRAWING NUMBERS AND DATES:
ic~616-2

SORE

COMPLETION REPORT FOR

3 3/27/51

For:

AOMON, BIIJIRI, ROJOA,

AT-( 29-1 1-507

OF

iy

"Not for use by A-E

23 March 1951

Power & Water Distillation Plant

108 - Station 100

3/23/51

DESCRIPTION OF PROPERTY UNITS

3

LOCATION & KBERIRU GROUP = SITES "D-V" DATE OF THIS REPORT:

The Complete Construction of
Bullding No, :

SHEET WO.

ESTIMATE

Quantity

Unit

Conatruction
Contract
Cost

Est'd.
Gov.

Value

Furnished

Material

Engineering
Cost

Total

POSER AND WATER DISTILLATION PLANT
This is a ons story reinforeed conerete structure with walls and roof alab 17"
thiek, floor slab 6" thiek and concrete masses of various sises for machinery
and equipment foundations. There are four hexagon shaped columns measuring
2'=" aerces the flats supporting the roof alab, and one messanine desk 15'-2*
x 17'-8 1/16" with an 8" thiek reinforced soncrete slab. There is a 2'-0" high
parapet 12" thiek across the front, and 1)" thiek wing-walle extending
15'-0" from each corner of the front face of the building. Interior dimensions
of 51'-O* = 2'~0" x 15'-0" high, give an area of 2,142 square feet on the aain

floor plus 265 equare feet on the messanine, and a total content of 32,130

eubic feet. Three exterior walls and roof are water sealed with 2 layers of 15
pound rag felt, hot mopped, and structure is earth covered to « minimum depth
of 2'-0" graded off two sides ani rear at the rate of 1' to 3'. Building
ecmplete with electrical fixtures and wiring, telephones installation, three
diesel engine driven generators with cubicles end panel boards, pumps, and three
distillation units; diesel engine piping, distillation piping, and ventilation
equipment and dusts. Installed equipment includes: Two air eampressors, two
air tanks, one chemical feeder, one condensate pump unit, one liquidcmeter,
three transformers, one boiler, one acid tank, ome fuel oi] tanks, and one
acid pump. Installed equipment costs for generating electrical power or water
distillation are not included on this sheet. These items are included on sheets
for thedr respective system.

Direct

Indirest

$56,365.26
51,712.43

#1,027.95

$109 105.64

“Proration of

Charges to Unite

Select target paragraph3