ATOMIC ENERGY COMMISSION

SANTA

SFO. 436
13. 80)

FE OPERATIONS OFFICE

COMPLETION REPORT FOR
JOB NO.

AS-BUILT DRAWING NUMBERS ANDO DATES:

20-903-2
20-90h-2

20-353-2
16H~626

2/2/51
2/2/51

610 = Se

CONTRACT NO,
For:

2/2/51
2

SHEET NO

LOCATION & BBERIRU GROUP - SITES "D—-V"

Bullding No.: 106 and 110
omer

DESCRIPTION OF PROPERTY UNITS

Quantity

Unit

8

or_1)

"Not for use by A-E

AQMON, BILJINI, ROUJOA,

AT-( 29~1 1-507

The Complate Construction of Shop Building and Timber Grease Rack

2/2/51

"Property
Account

S eel”

DATE OF THIS REPORT:

2 February 1951
,

ESTIMATE
Construction
Contract

Est'd. Value
Gove ural shed

Engineering
Cost

Total

$163.37

$14,794.85

*Proration of
Charges to Units

SHOP BUILDING — Bldg. 106
Que story, double roof, prefabricated alumimm structure; rectangular shape;

ise I.D. 2k'-0" x yo'-8 1/2® x 10'-0" mean height; eet on a 5" thick reinforced

concrete slab; vented window panels; light end power wiring and fixtures;

drinking founteain; floor ares 0.D. 1,05h square feet; cubic contents 1.D. 9,937
cubio feet. Benches and gall parts bin.
Installed equipment includes:

t

GREASE

-

Two drille and one saw.

1

Each

Direct
Indirect

$9,619.87
5,011.61

°

Qne grease rack of tisber construction; overall sise at grade level 1,'-0" x

h2'-9 3/4"; two tread ramps rising from concrete pads to elevated planking
5'-5" above grade; tread ramps and elevated planking 2'-0* wide, constructed
of 3" x 6" plankings 3'-3" between ramps which rise through a distance of

20'=6") horisontal elevated planking 22'=3 3/l" in length; 2" x 6" decking on

sills between structures; floor area 69 square feet; Douglas fir tiaber supports,
brecing and planking ebove 6" x 8 redwood sills set on grade.

1

Rach
Direct

Indirect

$556.08

129.77

$687.85

fecting

tec Ite
ten Ls
in abvere

vn te
minal

Select target paragraph3