ATOMIC ENERGY COMMISSION
‘SANTA FE OPERATIONS OFFICE
- -
SHEFT MO.
COMPLETION REPORT FOR
pecna.
i
20-937
24-9 35
3/ly/51
3/19/51
2a—48)
26-936
3/19/51
19/51
24-381,
/
:
t
.
For.
3/19/51
.
ce
ltr
vert,
bok et
The ‘omplete
tu il Wi fg
-
oo
—
7
-
cree
liana
CESORERIEGN OF
toe
-
ae
en
.onstruction
Nol:
ge
/
PRURERTY UNETS
7
This is a one story, double roof, prefabricated aluminum building, size 1.D.
|
With the floor slab and the supporting walls amd footings, is canopy covered with
|
|
slab; total floor area 7,367 square fect complete with electric wiring md
fixtures, and plumbing. The installed equipment includes: Four - five com-
|
Reefer Building
DATE OF THIS REPORT:
dg March 1951
~
.
Quantity
|
ae
Unit
a FSTIMATE
-
aa
Caootra teen
:
hontea t
yt
Lo.
-
——~4
tutta. Value
F
.
ow.
Furnished
Material
-—— —- ——
—
Engineering
ot
|
Cas
"Procation of
Charges to Units
nites
ge
:
Total
RSEFER BUILDING
|
;
of
or Wl .
33
Nombe r
|
LOCAT(oN EMIWBTOK ISLAND = SITE "A"
CONTRACT NO. AI=129-1iepa7
64O = 24-2
12
“Not for use by A-E
241-0" x 236'-8 1/2" x 10'-O" mean height, erected on a 5" reinforced concrete
floor slab '-6" above grade; a full length six-foot loading platfors integral
a 1/2 length of standard alumimm roofing; steps are provided at each end of
the loading platform; compacted earth fil] between foundation walls and floor
partment walk-in refrigerators, and five 1 ton ice machines.
1
Each
Direct
Indirect
$32, 396.96
ll, 755.67
$967.07
$45,119 +70
of
1
he
we
aon!
apeabrese cea
epee
te
ae
.
» alocting
itt.
ee
be
a ime
tHe,
.
eostathe
.
were
ob ites
Ute