ATOMIC ENERGY COMMISSION ‘SANTA FE OPERATIONS OFFICE - - SHEFT MO. COMPLETION REPORT FOR pecna. i 20-937 24-9 35 3/ly/51 3/19/51 2a—48) 26-936 3/19/51 19/51 24-381, / : t . For. 3/19/51 . ce ltr vert, bok et The ‘omplete tu il Wi fg - oo — 7 - cree liana CESORERIEGN OF toe - ae en .onstruction Nol: ge / PRURERTY UNETS 7 This is a one story, double roof, prefabricated aluminum building, size 1.D. | With the floor slab and the supporting walls amd footings, is canopy covered with | | slab; total floor area 7,367 square fect complete with electric wiring md fixtures, and plumbing. The installed equipment includes: Four - five com- | Reefer Building DATE OF THIS REPORT: dg March 1951 ~ . Quantity | ae Unit a FSTIMATE - aa Caootra teen : hontea t yt Lo. - ——~4 tutta. Value F . ow. Furnished Material -—— —- —— — Engineering ot | Cas "Procation of Charges to Units nites ge : Total RSEFER BUILDING | ; of or Wl . 33 Nombe r | LOCAT(oN EMIWBTOK ISLAND = SITE "A" CONTRACT NO. AI=129-1iepa7 64O = 24-2 12 “Not for use by A-E 241-0" x 236'-8 1/2" x 10'-O" mean height, erected on a 5" reinforced concrete floor slab '-6" above grade; a full length six-foot loading platfors integral a 1/2 length of standard alumimm roofing; steps are provided at each end of the loading platform; compacted earth fil] between foundation walls and floor partment walk-in refrigerators, and five 1 ton ice machines. 1 Each Direct Indirect $32, 396.96 ll, 755.67 $967.07 $45,119 +70 of 1 he we aon! apeabrese cea epee te ae . » alocting itt. ee be a ime tHe, . eostathe . were ob ites Ute

Select target paragraph3