ATOMIC ENERGY COMMISSION
» SANTA FE OPERATIONS OFFICE
SFO. 430
(3- $0)
AS-~HUILT
DRAWING NUMBERS AND DATES:
2A-975
2h-999
3/l9/.
3/19/61
24-028
83/19/51
2h-1i92
3/19/52
24-5408
JOB NO. 640 - 24-1
CONTRACT NO.
For:
"Not for use by A-F
LOCATION
AT-( 29-1 1-507
The Complete Construction of
Building No.:
ENIWETOK ISLAND - SITE "A"
Account
cd
19 March 1951
34
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
Number
DATE OF THIS REPQRT:
Boiler House
3/19/51
"property
23 of. rt
sucer no
COMPLETION REPORT FOR
|
|
Quantity
unit
| construction |
Contract
Cost
Est'a. Value
oo,
Gov.Material
Furnisnea|
.
ENgi Cost
neering
po
BOILER HOUSE
This ia @ one story, double roof, prefabricated aluminum building aise I.D. 24'!-0"
x by'-8 1/2" x 10-0" mean height, erected on a 6" reinforced concrete slab, with
reinforced concrete boiler foundations and water storage tank supports. Reinforced
concrete fuel tank supports, and deaerator stand and foundation outsides of
building.
Total floor area 0.D. 1,155 square feet, complete with electrical
wiring and fixtures, piping. The installed equipment includes: Four boilers,
two deasrators, air compressor, storage tank and water heater with storage tank.
1
Each
Direct
Indirect
$21,062.41
2,254.33
$185.4,
''
Froratiac mn
Charges
ee
$23,502.18
to
of
Units