ATOMIC ENERGY COMM!SSION
ae SATA. FE OPERATIONS OFFICE
SFO.434
(3.50)
ust
via Bere ys Bry Mes
2B-307-32 1/6/51 28+307-35 1/6/51 2B307-39 1/6/51
AS-BuitLT DRAWING NUMBERS AND DATES:
-307-
2B-WOl-4
2B-916-1
a
1/6/51
1/5/51
-
-2B-307-36 1/6/51
JOB NO, 640 - 2f-1
640 - 2g-1
-28-307-4 1/6/51
rors tne Copia
cnetracton 9 1 tan Quarters
Building No.: 18 thru 21, and 36 thru 2
CONTRACT NO.
,
Construction
Property
Account
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
Contract
7
wer W5
DATE OF THIS REPORT:
6 Jan
19
ESTIMATE
Est'd.
Value
-
Gow ere ined
Engineering
Cost
Total
18 MAN QUARTERS
One atory, double roof, prefabricated aluminum construction; rectangular shape;
size I.D. 2h'-0" x 68'-8 1/2® x 10'-0" mean height; anchor bolted to a 5" thick
concrete slab; vented window panels; aluminus partitions; with electrical wiring
and fixtures; plumbing; floor area 0.D. 1,759 square feet; cubic contents 16,190
cubic feet; nine rooms, toilet and showers, corridor and vestibule.
Installed
equipment includes: A water cooler with drinking fountain, and a refrigerator.
11 buildings except 36, 39, and 40 are also equipped with water neaters.
9
i
TOTAL - 9 Units
Bach
Unit
Direct
Indirect
Direct
Indirect
$5,654.23
170.34
$51,158.09
1,533.08
@¢
or.)
“Not for use by A-E
LOCATION ENIFWETOK ISLAND = SITE "A"
AT~1 29-1 1-507
_—
SHEET NO.
S fifi
COMPLETION REPORT FOR
Wer5.
$169.97
$6, 044.5)
$1,709.71
$5,100.88
*Proration
Charges to ofUnits