7
5FO. 43a
13. 50}
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OF FICE
COMPLETION REPORT FOR
AS-BUILT GRAWING NUMBERS ANO DATES;
pa
3/19/51
3/19/51
24-5102
3/19/51
nwt
3A9/
24-5103
3/19/51
___2a-$11)
"Property
JOB NO, 640 = 2-b
CONTRACT NO.
For:
The Complete Construction of
Li
6
"Not for use by AE
DATE OF THIS REPORT:
19 March 1951
PE, - Barber Shop - Post Office Building
16
ESTIMATE
1/5)
Account
e
LOCATION EMIWETOK ISLAMD ~ SITE "A"
AT-( 29-1 1-507
Bullding No.:
SHEET NO.
Construction
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
Contract
Est'd.
Value
Gove puroished
Engineering
*Prorati
Cost
Total
$810.55
$54,557.16
ion
P.2. = BARBER SHOP - POST OFFICE BUILDING
This ip a
» double-rocf, prefabricated alwainum building ai,e I1.D. 24'-07
x 100'-8}" x 10'-0" mean height with two wings, each sige I.D. 24'-0" x 50'o8o" x
10'.0" sean height, anchor bolted to a 5" aoncrets slab. Gamplete with electric
wiring and fixtures, plumbing, telephone; couters and shelving. Total floor
ares 5175 square feet.
Installed equipment includes exhauster & hood, water
ooolar with drinking founteain, water heater, refrigerator, grill, six barter
cabinets & five barber chairs.
1
each
Direct
Indirect
$43,891.82
9,854.69
“The document eontal
the Matioradt Piefers
Trangmyyes he
in a
ped te
penhiice
t
Charges to Unite
Pedera) Laws