ATOMIC ENERGY COMMISSION
TIONS OFFIC E
SANTA FE OPERATIO
FOR
REPORT
COMPLETION
JOB NO. 640 - Ta
AS-BUullLT DRAWING NUMBERS AND DATES:
CONTRACT NO,
For:
AT-( 29-1 )~507
oo.
;
SY
a
88oraT
“Not for use by A-E
LOCATION BOGALLUA ISLAND - SITE "F*
BATE OF THIS REPORT:
The Complete Construction of Site Preparation, Engineering Design, &
Building No.:
Preliminary Work
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
Quantity
unit
Construction
Contract
Estid.
Value
OOMteeta
Engineering
Cost
Total
Fiald Sketches #77 and #83 may be used as reference far the preliminary wrk and
materials which have been reported as follows:
(1)
Blade & Shape
(2)
Control & Signal Cable
(3)
Pier
(4)
Air Strip Matting 50' x 900'
(5S)
Breakwater
(6)
Channel
(7)
Commnication System including
240,000 sqe ft.
78,750 lineal feet
20 foot
5,000 sq. ft.
1,300 feet
Direct
Indirect
$1,097.36
1,194.17
$23.91
$2,715-b4
Indirect
1,118.3
431.3h
5,888.12
33.60
1,055.05
412.56
17 9395093
31.07
1,716.3
$20.54
$20.54
$651.56
$651.56
$1,190.63
$2,190.63
Direct
Direct
Indirect
743278
277-67
Direct
Indirect
Direct
Indirect!
12,939.56
4,043.81
738 42
946.87
Direct
19,149.53
Direct
Submarine Cable
yy 338.35
415.58
Considerable preliminary work was involved however, original plans were never
completed and no As-Built drawings are submitted. The survey department
reports that due to shifting sande and attempts to control same being unsucceseful
the project waa abamioned.
The following are features which were not constructed but to which design
charges are applicable:
200 foot
tower
Water Facilities
Electrical Facilities
“This document,
ae T
*
&@
the Nutional |
irprsminshin
a
inal! es
*Proration of
Charges to Units