SFO. 430
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR
JOB NO.
AS-BUILT DRAWING NUMBERS AND DATES:
l-k79 12/23/50
21-963 12/23/50
tiaoe
ae
L480
For:
YES
4L-003 12/23/50
L961 12/23/50
WL-h77 12/23/50
6375 10/16/50 - 5/7/51 - Revised
bl-OOk 12/23/50
Wyle 12/29/50
"Property
CONTRACT NO.
640 - 3m
L-962- 12/23/50
The Complete Construction of
Buliding No.:
DESCRIPTION OF PROPERTY UNITS
Revised:
Unit
Construction
Contract
Cost
Est'd. Value
Gov. Furnished]
Material
1950
7 May 1952
ESTIMATE
Quantity
F
3
Electrical Overhead Distribution System and
Outdoor Substation
fileA 6/50.
Account
Number
"Not for usd¥by ALE
DATE OF THIS REPORT:
23 December 1
LOCATION JAPTAN ISLAND - SITE "L"
_AT-( 29-1 1-507
.
Erg! neering
Total
$456.56
$22,040.79
$1, 280.90
$47,169.72
Cost
ELECTRICAL OVERHEAD DISTRIBUTION SYSTEM
Thie system consists of 2400 volt primary and 120 - 240 volt secondary conductors
overhead; supported by poles, croes arms, and fixtures, spaced approximately 115
feet apart; 19 transformers; platforms; and drop services.
GOMDUCTORS - Overhead - Sise # 1/0 - Secondary
Size #4
Sise
Sise
Size
Size
#4
#6
#6
#10
—- Primary
=
-
Secondary
Secondery
Secondary & Street Lights
Secondary
POLE ASSEMBLIES - Average length 10 feet
STREET LIGHTING FIXTURES (on distribution poles)
SERVICES - Overhead - 2 Conductor
3 Conductor
Conductor
200
L.F.
S00
2,00
7600
150
L.F.
L.F.
L.F.
L.F.
27
Each
4700
L.F.
7
Each
37
Each
9
Each
i
Each
Direct
Indirect;
$13,381.02
8,203.21
OUTPOOR SUBSTATION
South of Power Plant Building; consists of 6" thick reinforced concrete slab
5°~0" x 19'-9", with conduit rack for power feeders and distribution. Equipment
inoludes:
Six transforsers; grounding system of two ground rods and 20 feet of
#1/0 ground wire; and a fence enclosing Substation Area, &'-O" high, 65 lin. ft.
of chain link type including |,'-0" gate.
1
Each
Direct
Indirect]
$33,765.02
12,123.80
CA
“This document os
the National belo
Salmon ont
rr e
fant manner
.
Proration of
Charges to units