AS-BUILT DRAWING NUMBERS AND DATES:
100=257-1
3/28/51
100=257=2
3/28/51
100=257-3
3/28/51
FS-601
3/28/51
JOB NC. 730.3 - 9p
CONTRACT NO,
For:
l*property
Account
Number
“Not
AT~( 29-1 1-507
LOCATION
MUZIN ISLAND - SITE *S"
oe
or 38
for use by A-E
DATE OF THIS REPORY:
28 March 1951
The Complete Construction of Air Force Structure Type A-2,1
etn
;
Building Now: 3d
-
DESCRIPTION OF PROPERTY UNITS
Pn
Quantity
unit
_
Construction
Contract
Cost
ESTIMATE
“Est'a,
Value
Gov. Furnished
Materia!
ee
Ena;
.
ngineering
Cast
oe
Total
BUILDING HO, 3.3.4
4 reinforced concrete, brick and steel structure, pre-cast T shape columna, beans,
struts and coping, four bents wide, sise 0,D, 56'-10" x 106'-0* wide, ends open,
brick masonry side walls and metal window frames and sash, erected on 1'-4 1/2" x
51-4" depth foundation walls, laminated wood (2" x 6" finished 5 1/2" thiok) deck
roof with built up cover, two full length sky light monitors with fixed steel] sash,
and corrugated metal ends,
One side wall has structural stee] wing wall extensions
at each emi, aise 20'-6 1/2" long x 19'-6 1/4" high, the total height of the structare above grade is 25'-0", the covered area is 6,024 square feet,
1
Each
Direct
Indireat|
Piers for Displacement Gagea (Dwg, 100-262-1),
$70,076, 36
59,574.66
-O-
$129,651.02
A reinforced concrete structure
with a foundation footing 3'-0* x 4'=-0" x 9" thiok and a pyramid rectangular cross
section rising 10'-~O" above footing, tota] masse 1,5 aubic yards, Location to
be show on site plan,
2
Each
Coat included in Tnetrumentetton
Instrumentation
Direct
Indirect)
18,525, 38
17,359,29
$5,201.42
41,086,09
Total Structure and Instrumentation
Direct
Indirect)
88,601.74
76,933.95
§, 201,42
170,737.11
4
|
LL f ‘
+
100-262-1
SHEET no._ J}.
COMPLETION REPORT FOR
“4
ATOMIC ENERGY COMMISSION
“GANTA FE OPERATIONS OFFICE
SFO.43 0
(3. 50}
"Proration of
Charges to Units