war.
FRENCH FRIGATE SHOALS
F&S NO.

22004
USER

TITLE

Riometer Station -~ Subtask A628
STRUCTURE /FACILITY NO.

Tc

($000)

DASA/

PRE-GO

EAO 1106-|

POST-GO

RDT&E

4101-61

}

SCIENTIFIC STATION NO.

None

FUNDING

AGENCY

|
BODGO

93-3-4
ENGR

PROC

CONST

+105
FODGO+135
TOTAL

FURN

Engineering costs included in F&S Number 21007.
Estimate 12/65

|TOTAL

19.1

19.1

19.1

19.1

|

|

|

PRIOR YEARS
ENGINEERING Completed.
Drawings:

93-002-C2

93-3-4-Al, Cl and El

POST -GO
PROCUREMENT

To be accomplished.

CONSTRUCTION

Test Command will furnish the following equipment:

a) one

30 and 90 mc oblique antenna; b) one 30 mc Riometer antenna; c) one 90 mc
Riometer antenna; d) one instrument van; and,

e) one air conditioning unit.

The contractor will furnish one storage CONEX.

Power requirements are 10

kw, 120/240 volt, 60 cycle, 3 phase plus 100% backup.

This requirementwill

be served by utilizing the generators listed under Subtask A609 (F&S No. 22002).
The contractor will perform the following: a) provide a cleared, flat, unobstructec
area approximately 75 x 150-ft.; b) site the instrument van and the storage
CONEX in the vicinity of the Test Command erected antennas; and,

d) install

the generators and complete the electrical hookup to the instrument van. Refer
to Figure A-19, Appendix A, for location. Scientific personnel assigned to

Subtask A609 at this location will operate Suotask A628.

VOL II

April 1969

22-6

——