ey

FRENCH FRIGATE SHOALS

F & S NO.
22003

TITLE
Vertical Soundings of the Ionosphere - Subtask A616

USER

STRUCTURE, FACILITY NO.

TC

SCIENTIFIC STATION NO.

None

93-3-3

FUNDING
AGENCY

($000)

DASA /

PRE-GO

EAO 1106-|
4101-61

POST-GO
Estimate 12/65

30.7

30.7

TOTAL

30.7

30.7

RDT&E

ENGR

gop

PROC

CONST

GO+130

FODGO+160

TOTAL

FURN

Engineering costs included in F&S Number 21004.

PRIOR YEARS

ENGINEERING Completed.
Drawings:

93-002-C2

93-3-3-Cl and El
POST -GO

PROCUREMENT

To be accomplished.

CONSTRUCTION

Test Command will furnish all antennas and one instrument

trailer 8 x 36x 10-ft. high.

Contractor will furnish the following: a) two 60-ft.

and two 80-ft. poles; b) one 100 gallon water tank;
ities; and,

c) latrine and sewage facil-~-

d) two 30 kw, 120/208 volt, 60 cycle, 3 phase generators.

One of

the generators is utilized as a back up power source.
The contractor will perform the following: a) the two 80-ft. poles will be erected 860-ft. apart and the two 60-ft. poles will be placed on a line offset 18-in.

from the line connecting the 80-ft. poles; each 60-ft. pole will be 188-ft. from
the center point between the larger poles; b) install TC furnished antennas on

the poles; c) site the instrument trailer; d) install water tank and provide
water for photographic processing; e) install generators with automatic switchgear; f) install septic system for sinks and toilet; and, g) provide electrical

hookup where required. Refer to Figure A-19, Appendix A, for site location.
Two scientific personnel are assigned to Subtask A616 at this location.

22-5