21015

Weather Station,

USER

STRUCTURE FACILITY NO.

JTF -8

SCIENTIFIC STATION NO.

None

FUNDING
AGENCY

($000)

JTF

PRE-GO

CRO7-65

POST-GO

MILCON

USAF Air Weather Service (AWS)
BOD

None
ENGR

PROC

CONST

GO+e3

FODGO+30

TOTAL

FURN

Engineering costs included in F&S No. 22009

Estimate 12/65

TOTAL

26.0

26.0%

26.0

26. 0%

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

108-002-C2
108-038-Cl1 and El

TYP 035-Al and A3
TYP 036-Al

POST-GO
PROCUREMENT

To be accomplished.

CONSTRUCTION

The contractor furnished items include:

b) four 4 x4 x 6-ft. hot lockers; and,

c) two 20 kw,

a) two 16 x 32-ft. tents

120/208 volt,

60 cycle,

3

phase generators. One of the generators is utilized as a back up power source.
In the event a central power system for the island is provided, only the back up
generator is required.
The contractor will perform the following: a) prepare a level 60 x 250-ft. site
oriented to the prevailing winds; when siting scientific equipment, obstructions
within 500 yards in excess of 50 above the surface as well as signal reflections
from the metal buildings should be avoided; b) erect a 16 x 32-ft. joint operations tent, with flooring, screen doors and screen siding with side flaps ex-

tended at the approximate slope of the tent roof for the use of AWS and communi cations personnel ; c) erecta 16 x 32~ft. maintenance and supply tent, screened
for ventilation and insect control;
electronic spare parts;

d} install four hot lockers for storage of

e) construct one 10 x 10-ft. concrete pad with ground

rod in center; f) constructa 3 x 3-ft. concrete pad, with tie-down rings, located approximately 800-ft. within line-of-sight of the operations tent; and,

*Includes construction costs for F&S No. 21014.