CANTON
F&SNO.

TITLE

21014

Communication Center

(U. S. Army Strategic Communication Command)

USER

STRUCTURE FACILITY NO.

JTE-8

SCIENTIFIC STATION NO.

None

BoD GO +23

None

FOD GO+30
FUNDING
AGENCY

JTF

MILCON
CRO7-65

($000)

-|

ENGR

PROC

CONST

TOTAL

FURN

PRE-GO

Engineering costs are included in F&S No. 22009,
POST-GO
Construction cost estimate included in F&S No.

25010.

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

108-002-C2
108-038-Cl and El

TYP-035-Al and A3
TYP-036-Al

POST -GO
PROCUREMENT

To be accomplished.

CONSTRUCTION

The U. 5S. Army Strategic Communication Command will furn-

ish 2 communication vans.

The contractor will construct a 20 x 20-ft. concrete

pad for siting the communication vans.
The Communication Center will share the maintenance and joint operations tents
with the U. S. Air Force Air Weather Service facility (F&S No. 21015). A site
will be established after a reconnaissance of the area has been made by Air Weather Service personnel.
Refer to Figure A-18, Appendix A, for possible site locations. Transmitting, receiving and cryptographic service will be provided to
all agencies located on this island.
One officer and 44 EM from a Provisional
Army Signal Unit (PASU), Team A-3, will operate the communication center at
this location,

21-11

VOL IL
April 1969