OPT.
SCIENTIFIC AND SUPPORT

HICKAM AFB
F&SNO.

07058
USER

TITLE

Security Fixes
STRUCTURE FACILITY NO.

AEC

SCIENTIFIC STATION NO.

None

BoD

None
FoD

FUNDING
AGENCY

AEC

($000)

ENGR

PROC

CONST

TOTAL

FURN

PRE-GO
Prior Cost*
TOTAL

0.7

0.7

O.7

0.7

COMPLETED
DESCRIPTION

Two (2) guardhouses

at the secure trailer compound were re-

located to provide the guard with a clear viewof the entry/exit gate while performing duties within the guardhouse. Interior communication lines were
A chain link fence (7-ft. high and approximately8-ft. long) was
also relocated.
installed from the personnel gate to a point beyond each guardhouse door inside

the secure area (completed in 1966).

DRAWING:

JS 95H-058-Al

“Additional costs are included in F&S No.

VOL II

05013.

7-44