OPT.
SCIENTIFIC AND SUPPORT
HICKAM AFB
F&SNO.
07058
USER
TITLE
Security Fixes
STRUCTURE FACILITY NO.
AEC
SCIENTIFIC STATION NO.
None
BoD
None
FoD
FUNDING
AGENCY
AEC
($000)
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
Prior Cost*
TOTAL
0.7
0.7
O.7
0.7
COMPLETED
DESCRIPTION
Two (2) guardhouses
at the secure trailer compound were re-
located to provide the guard with a clear viewof the entry/exit gate while performing duties within the guardhouse. Interior communication lines were
A chain link fence (7-ft. high and approximately8-ft. long) was
also relocated.
installed from the personnel gate to a point beyond each guardhouse door inside
the secure area (completed in 1966).
DRAWING:
JS 95H-058-Al
“Additional costs are included in F&S No.
VOL II
05013.
7-44