HICKAM AFB F&S NO. 07060 USER SCIENTIFIC AND SUPPORT TITLE Machine Shop STRUCTURE FACILITY NO. LRL SCIENTIFIC STATION NO. None BOD None FOD GO+0 homey AEC ($600) ENGR PROC CONST TOTAL FURN PRE-GO Prior Cost 0.5 0.5 FY 71 (For Estimated Costs, TOTAL see F&S No. 07002A) 0.5 0.5 PRIOR YEARS ENGINEERING Outline specifications and preliminary drawing JS 95H-058-Al7 have been completed. Fy 1971 ENGINEERING PROCUREMENT To be completed, To be accomplished. CONSTRUCTION A prefabricated metal building, 24 x 50 x 10-ft. high, will house a machine shop within the expanded HAFB trailer park (see F&S No. O7002A), The building will have a concrete floor slab. Interior walls will be lined with gypsum board and the ceiling will be acoustical tile. The building will be insulated, air conditoned and dehumidified to maintain a temperature of 72 + 4°F and a relative humidity of 50 + 4%. An8 x9 1/2-ft. equipment door and one personnel door will be provided. A tool crib, compressed air outlets, and 120 and 208 volt power outlets will be provided in the interior. Fluorescent fixtures will illuminate work areas to a level of 100 foot candies. The north end of the building will be floodlighted. The completed building will be furnished with typical machine shop equipment and spare parts. This equipment will include the following: Storage cabinets and bench tops Adjustable workbench stools Grinder Contour band saw and filer 7~45 VOL II

Select target paragraph3