Gan?
HICKAM AFB

SCIENTIFIC AND SUPPORT

07005

Drawings:

Page 2

JS 95H-3215-£1

PROCUREMENT

JS 95H-3215-Ml1 and M2

Completed.

CONSTRUCTION Modifications to Building T-3215 included installation of a
hot water heater, storage tank and injector pump, and modification of its
existing air conditioning system. The cost of this work was paid for with
maintenance funds. (Completed in 10/68)
“Costs are applicable to modifications following original rehabilitation.
of original rehabilitation are included in F&S No. 07015.

7~13

Costs

VOLII

Select target paragraph3