Estimate of Direct Cost.

The detail estimate of direct costs, without over-

head, including Bogallua as a fourth shot islami, is as follows:
Cost in Dollars

Item
Shape amd Stabilize areas

Material

Labor

Equipment

Transpe

Material

38,100

205, 300

34.0 5200

Lol, 200

2674200

509,000

477,100

Dust pallative on roads

26,100

4,00

4,500

45,100

Causeway Biijiri to Rojoa

70,400

57,800

38, 700

12,700

121, 300

4.3, 900

18,500

17,600

1863700

396, 800

173,200

517,200

Refrigeration plant & accessories

190, 300

20,800

3,800

11,000

Water facilities

739,800

4h7,200

58,000

67,000

Sewers

188, 300

20h, 700

19, 800

16 5000

Fuel facilities

218,700

176,700

65,400

41,600

Electric facilities

611,000

18 00

65,800

62,500

Telephone system

681,500

80,400

227,800

57,600

Control & Signal system

62,100

167 500

54,000

18 1,00

Radio back-up system

28,200

2,800

1, 300

900

Public address system

L100

900

200

300

Furniture;dining, housekeeping, etc.

96,600

8,00

2,200

2,400

Equipment; fire, kitchen, etc.

99,00

9,600

2,200

- 2,400

Pier construction

60,300

137,800

197,300.

22,600

Special shot island buildings

29,000

15,200

6, 300

42,000

Phase I field work, except towers

16,000

139,700

31,000

9,600

Asphalt paving

Shot and photo towers
Buildings, aluminum and tents

TOTALS

5,549,100 2,408,100

-

1,819,200 1,h2h,300
IX -7