Estimate of Direct Cost. The detail estimate of direct costs, without over- head, including Bogallua as a fourth shot islami, is as follows: Cost in Dollars Item Shape amd Stabilize areas Material Labor Equipment Transpe Material 38,100 205, 300 34.0 5200 Lol, 200 2674200 509,000 477,100 Dust pallative on roads 26,100 4,00 4,500 45,100 Causeway Biijiri to Rojoa 70,400 57,800 38, 700 12,700 121, 300 4.3, 900 18,500 17,600 1863700 396, 800 173,200 517,200 Refrigeration plant & accessories 190, 300 20,800 3,800 11,000 Water facilities 739,800 4h7,200 58,000 67,000 Sewers 188, 300 20h, 700 19, 800 16 5000 Fuel facilities 218,700 176,700 65,400 41,600 Electric facilities 611,000 18 00 65,800 62,500 Telephone system 681,500 80,400 227,800 57,600 Control & Signal system 62,100 167 500 54,000 18 1,00 Radio back-up system 28,200 2,800 1, 300 900 Public address system L100 900 200 300 Furniture;dining, housekeeping, etc. 96,600 8,00 2,200 2,400 Equipment; fire, kitchen, etc. 99,00 9,600 2,200 - 2,400 Pier construction 60,300 137,800 197,300. 22,600 Special shot island buildings 29,000 15,200 6, 300 42,000 Phase I field work, except towers 16,000 139,700 31,000 9,600 Asphalt paving Shot and photo towers Buildings, aluminum and tents TOTALS 5,549,100 2,408,100 - 1,819,200 1,h2h,300 IX -7