Arriift Plan CITF SEVEN No. 3-43 (4) CTG 7.4 will schedule and dispatch all liaison and helicop- ter aircraft. (5) Normally, requirements for liaison aircraft and helicopter use will be eubmitted to CTG 7.4 by using agencies prior to the day jaft 18 required. Requirements will be detailed, to include con- plete inter-island itinerary and lift load. 3. Inter-Avoll Airlift Operations a. CTIG 7.4 will provide an inter-atoll airlift system between b. Normally, requirements for personnel and cargo space will be ENIVETOK and BIKINI ATOLLS, with flights to other atolls in the forward =rea as required to support joint task force elements. placed with CTG 7.4 by using agencies prior to the day lift is required, c. On KOON minus one day, all C-47 aircraft will be withdrawn from ENIWETOK-BIKINI service. Subsequent to KOON shot the ENIWETOK-BIKINI service will be provided by PEM aircraft, taking off from ENIWETOK ISLAND airstrip and landing in the BIKINI lagoon. a. CiG 7.3 will place two (2) PEM aircraft under the operational control of CTG 7.4 to augment the ENIWETOK-BIKINI airlift system. P. W. CLARKSON Major General, U.S. Army Commander OFFICIAL: Hibbewleap fe, WILLIAM S. COWART, Colonel, U.S. Air Force Assistant Chief of Staff, J-3 Q-2