Arriift Plan

CITF SEVEN No. 3-43

(4) CTG 7.4 will schedule and dispatch all liaison and helicop-

ter aircraft.

(5) Normally, requirements for liaison aircraft and helicopter
use will be eubmitted to CTG 7.4 by using agencies prior to the day

jaft 18 required.

Requirements will be detailed, to include con-

plete inter-island itinerary and lift load.

3.

Inter-Avoll Airlift Operations

a.

CTIG 7.4 will provide an inter-atoll airlift system between

b.

Normally, requirements for personnel and cargo space will be

ENIVETOK and BIKINI ATOLLS, with flights to other atolls in the forward =rea as required to support joint task force elements.
placed with CTG 7.4 by using agencies prior to the day lift is required,
c. On KOON minus one day, all C-47 aircraft will be withdrawn from
ENIWETOK-BIKINI service. Subsequent to KOON shot the ENIWETOK-BIKINI
service will be provided by PEM aircraft, taking off from ENIWETOK
ISLAND airstrip and landing in the BIKINI lagoon.

a. CiG 7.3 will place two (2) PEM aircraft under the operational
control of CTG 7.4 to augment the ENIWETOK-BIKINI airlift system.

P. W. CLARKSON

Major General, U.S. Army
Commander

OFFICIAL:

Hibbewleap fe,

WILLIAM S. COWART,

Colonel, U.S. Air Force
Assistant Chief of Staff, J-3

Q-2

Select target paragraph3