Opere tion
ley marker buoys end conduct LOU survey of certain arees
7.3.7
(8)
ender direct suppert to Project 1.6 with modified LOM
7307
(9)
Transport leaded dummy device barge from PARKY {sland
LSD.of
Transport leaded dummy device barge from shot site te
LSD of
Commence laying moorings for Project 1.4, 8 Feb.
703 05%
Conduct rehearsal of cloud sampling eircreft eperations
7.30
Conduet rehearsal of drone ship operations with eontrol
7,346
(1b)
Commence instrumentation of Yroject 1.4,
70305
(1§)
Conduct eirborne tests of Project 1,4 telemetering,
72303
(1@)
(11)
(22)
(18)
to shot site
7309
Vesel
while underway
fron aircraft,
(16) Transport shot barge londed with speeial device to shot
LSD of
(19)
70307
;
Commence evacuation of trailers from shot site,
Shot setivities,
&,
7039
PARRY Islend,
site.
5»
pull
(9)
including
70309
eua th
The Shot and Evacuation 2hase will commence ebout six (6) arys prior
to the fisst scheduled shot and will continue until ebout three (3) deys
after the final shot,
freeshot evacuntion of all or nearly all personrel,
and novenent of verying quantities of equipment, will te required for each
ehot et BIKINI atoll, No general personnel evecuetion nor extensive movement
of equipment is planned prior to the scheduled shot et EXIWETOK atoll, dn
energency post-shot evacuation of personnel fron the non~shot Atoll may be
required,
bd. ALL ships, except those required at the non—involved Atoll, will go
to sea prior to each shot and will remedn at sea until efter the saot is de-
tonated and redioleciaal conditions pernit safe reentry,
Boats and craft
will be loaded on the LSD, or go to sea, or be beached or anehored in safe
loealities 4y the lagoon in deep water for each shot at the affected Atoll,
_
bel
CNA
95