| Operation Plan CTG Fed No, 1-53 (1) Sortie, with YAGs in tow if necessary, as directed. (2) If the YaGs cannot be manned due to radiological hazards, de prepered to moor them to buoys in the lagoon, h, end i,) CTU 7.3.7 and 7,3,8 ~ BIKINI end ENIVETOK Harbor Unites (1) In the absence of CTG 7.3, take necessary action, Keeping CTG (2) Fornulate plens with other task groups, and execute such plans 7,3 advised, ‘ as necessary, for the following: (a) Beeching or mooring harbor and small craft, (») Evacuation of personnel and material, (3) In the absence of CTG 7.3, designate small craft to te loaded in (4) Fuel DDEs to eapacity, (5) Large ships sertie es directed, LSD, if present. je CTU 7.369 — Transport Unit (1) Load any barges with special devices in LSD, as éirected, (2) Load AVR, LOUs, LCMs and LCPle in LSD, as directed, (3) Load AINSWORTH with personnel ef the other task groups, a8 (1) When directed, ali ships larger than PC 1546 put to sea, (2) All ships and boats take maximum precautions against heavy (3) All commanding efficers shall be thoroughly faniliar with directed. x. ‘ PC 1546 and smaller non-amphibious creft, except small beats, shall be moored to heaviest neorings availeble, <Anphibious craft and snall beats shall:be moored, ’ anchored or beached, 5 as PB practicable » DRA weather, Appendix II to Annex 0 of CinCPacF1lt OpOrder 201-52, Glee, K-3

Select target paragraph3