_
=
-
Q)
-~
-
oN
.
7
Assure that transient traffic and airlift ‘operations ao not
- interfere with or. endanger test aircraft operations during
thé K-Day event, "(See Annex Ay TE 7h Operations Order 25h) -
(2), Provide two (2) C-l7 aircraft fo VHF relay for the K-Day
mission.
(3)
(See Annex PF, TG 74 Operations Order 2-54.)
-
Establish required measures to prevent movement of vehicles
from interfering with or endangerirg air operations throughout K-Day.
(4) Provide adequate érash removal end “Lre fighting protection
_for allair operations. on K-Day.
%
;
(5} Place one Q) H-19 helicopter under the operational “cantro)of the SAR Element commander and one (1) crash boat under the
operational control of the AOC from 27 February 1954 and con-
tinuing throughout the project.
tions Order 2-54.)
(6)
.
7
(Ses Annex ¥ ms Tok OperaDe
,
!
‘
Assure adequate refueling and field.weintenance eupport for
all aircraft during the ‘K-Day events.
.
(7) Provide photographic soverage during K-Day operations for
historical purposes.
(8)
:
/
-
ee.
In coordination with other Test ‘Units, assure’ adequate trans' portation schedule from the flight line to the, dining halls
and billeting areas throughout the K-Day event.
(9) Coordinate with Test Aircraft Unit to assure that C-L7 FE. ~
FLECTOR aircraft are‘marshalled as required by that unit. -
wo
'
0)
Provide for: aircraftdecontamination, - o as
+
x, AIL Units: 9s.
‘
.
/
“ay Provide ‘Vaison officers to assist Headquarters TC 7h air.
:
:
.
oraft. ‘controllers dn the ..0C, on the Conmand Ship and Control -
-
Destroyer as required,
2-5s)
.
a
(See Annex K, TC Teh| Operations Order
ae
me
-
mrs,
(2) Coordinate with Test.‘Support ‘Unit to arrange required early,
:
‘dining schedules, - in-flight iunches, ‘transportation, etee, a
for the K-Day mission. cote
(3)
.
Lee
Adhereto security procedures as outlined in Annex G, ‘Security.
’ and Public Information, Te Teh Operations Order 1-53mf
:
E .
i
F
,
.
oor)
yo
(4)
:
mop ty
Emphasize the Flight Safety Program outlined in Annex L, ,
}
Ct,
Flight SafetysTeaf vt Operations Order,493 and. other direc. Sale
tives.
| - ue
aa
os
2 . 7
re
‘
.
2at
“oN
OY Be prepared: to‘augmént existing “SAR fectlities in emergencies’ : ‘,
. during the X-Day eventsos we.EL.
eee
ao
“Be prepared to postpone ‘execution of the mission, for euch
,
- Pereoee as are made necessary by adverse weather or other un_
, foreseeable eventee (See Annex V, TG 7.4 Operations order ‘ ‘