CHAPTER II, SECTION 5
Figure 2-122.
Station 1341 - Pouring Side Walls
made, based on dvnamic conditions. Designs
were started on 4 May: 23 plans and two sketches were submitted from 1 June to 25 September.
These drawings were approved from 25 June
to 19 November.
CONSTRUCTION.
Work was scheduled to
commence on 1 September and to be completed
by 5 January 1954. Actual work started on 5
September and was completed on 25 January.
Figure 2-119 shows driving railroad rails as piles
to form bulkhead for site Delta. Delta was a
man-made «sland. This figure notes status of
work as of 10 September. Figure 2-120 shows
the bulkhead and coral fill nearing completion
on 14 September. A 1.3 foot discrepancy was
found between the originally designed clevatrons of Station 1341 and Station 20 on site
Charhe its reference zero). This resulted trom
a site Charlie datum error introduced by reef
current cfifect on the tide gage. The Charlie
datum was adopted for construction of all sub-
ae
Rua
ES
Figure 2-123.
Station 1341 - 61% Completed
Page 2-123
to
Te ee eet
a vaMm
acl
ttclile