CHAPTER Ii, SECTION 5
design started on 23 September: one drawing
was submitted on 29 September and was approved on 23 October.
CONSTRUCTION’.
Construction work was
scheduled to commence on 15 November and
to be completed by 31 December. Actual construction started on 31 December and was com:
pleted on 6 February.
STATION 1307
CAMERA PIERS AT IVY STATION 303
SIGHT JANET - USER: FE G&G
GENERAL This Station consisted of rehabili-
tating the cxisting mounts located on the roof
of IVY Station 1601.01
(ex-GREENHOUSE
Station 69). IVY Station 303 consisted of two
concrete piers,
17
feet
high. anchored
to the
roof and embedded with mounting plates. vartous 3” O. D. pipe slecves and metal cable ducts.
The Station was used for technical photoyzraphy.
ENGINEERING. Engineering work was included with Station 72.01.
CONSTRUCTION,
Work was started and
completed on 20 January 1954.
STATION 1341 - CAMERA BUNKER
SITE DELTA - USER: LASL
GENERAL. This Station. used for high speed
photography, was a complex, massive reintorced
conerete bunker planned to be exposed to tre-
mendous blast pressures. The approximate overall dimensions were 33 tect wide by 69 feet long
and 33 fect high (above foundation).
‘The
structure was theee-stories high with exterior
wall and root thicknesses varying from a muinimum of three fect to a maximum of six feet
x oainehes. A vertical slot from foundation to
the underside of the roof (called the chimney)
evccted at the rear of the structure.
Three
reams Were located on the first tloar, one room —
on the second flour, and one room on the third
tloor. The exterior side walls of this Station
extended tusward the rear to form a pair of
sloping
The
front
wall
was con-
MECHANICAL. Mechanical features were a
dehumiditication system, a 500-gallon diesel
fuel oil storage tank, and a monorail with trolley
and half-ton hoist.
ELECTRICAL. This Station had its own power
generation plant which consisted of two 66 KW
cenerator sets. A conceated rigid conduit system
was uscd throughout to provide clear wall sur-
faces. To obtain maxunum head room, special
recessed incandescent iixtures were specified.
ENGINEERING, Initial criteria were received
on 27 March 1953. Revised criteria were received on 27 April, and on 16 June. Criteria
reverved on 5 October required a closing time
“ay
eh,
Figure 2-119.
buttresses.
structed of imonite concrete.
+
¢ Wee
cot
Station 1341 - Forming Istand “Delta”
toy