CHAPTER II, SECTION 5
ToTFN
a ee LOR
Fee ng
*
Figure 2-80.
Station 50 and Security Area Completed
outside the Station all within a fenced secunty
lighted area. Power was supplied from power
plant, TA-500, to a 112.5 KVA Substation
adjacent to Station 40. This Substation supplied
the power for that area.
ENGINEERING.
on 26 May 1953.
ceived on 31 July,
additional building
Initial criteria were received
Additional criteria were re5 August and 19 August. As
protection was desired, it was
decided to provide a 45-foot by 26-foot high
blast wall. On 20 November the blast wall was
replaced by canvas siding. The initial design
work started on 27 May, the mechanical designs
started on 1 June, and the electrical design
work started on 16 July after the structural
features were firm. Sixteen drawings and one
sketch were prepared and they were submitted
from 7 July to 24 December. Approvals were
dated from 7 August to 8 January 1954. Remote
controled canvas siding was provided which
presented a difficult design problem. Results
~
Ah
trrte
wh 2s eee
an
wee
tha
a
metas
we ee
ORD
*~
aman
as
AeELE
nétahine
neieiiedintateletel =
were satisfactory to the User on the initial test.
o
Figure 2-81.
Station 50 with Canvas Siding
41;87 325
Page 2-92
=
Oe
7.
oo
~
ML ae
a
Figure 2-82.
*
Site Uncle with Clearing Towards
Station 50