CHAPTER il, SECTION 4
Figure 2-59.
Nan Camp
on 14 September. Figure 2-62 is an aeria! photograph of the Fox campsite taken on 2€ February 1954. Figure 1-7 notes camp arrangements
upon completion of work.
established to act as a construction base for the
Dog, Easy, Fox, George group in constructing
the Scientific Stations and User support facilities in that vicinity.
ENGINEERING.Typical minimum cost temp-
CONTRACT ITEM NUMBERS A-64-C thru
A-64.3 - P.O. L. FACILITIES - SITE SUGAR
orary construction plans were prepared by Fieid
Engineering. similar to the other temporary
camps.
GENERAL.The P. O. L. storage facilities located on site Sugar consisted of a small open pump
shelter with two electric motor driven pumps,
four 1000-barre! bolted steel tanks, two 500barrel bolted steel tanks, two elevated navy
CONSTRUCTION. The main camp was occu-
pied and operating on 15 September. Figure
2-60 showsthe floor slab of the mess hall being
poured on 13 August. Figure 2-61 notes the
progress in the constriction of the Fox Cemr
w—
ll
=~
.
.
cuces. .
4
ime! buoys,
te
teem
Lee See wh ne 8 te
tre aGur-inca sUGiuArINE
ships
r
Lh.
_
>
.
Sseeeeee
es
~n
“
ca ORY a
Figure 2-60.
Page 2-80
gw TE ee mevesaeen eee -
OD Reet
Sk
Pouring Mess Hall Slab - Fox Camp
le
-
3
y