CHAPTER !, SECTION 3
The scope of the work required for OPERATION CASTLE was increased throughout the
construction and operational period, which necessitated subsequent modifications to the Con-
tract. A schedule of contract modifications af-
fecting work scope for OPERATION CASTLE
is shown in the following table:
MODIFICATIONS INCREASING THE SCOPE OF WORK
FOR OPERATION CASTLE
Modification
Modification
Modification
Modification
Modification
16
23
26
31
36 (in negetiation)
$ 7,170,020
$136,185
10,904,585
6,216,561
353,240
237,550
749,392
858,530
$726,975
$726,975
2,560,009
1,831,949
28,623,115
Jobs II, II, lV & V
Budget Projects
3028
A015
2,500 000
286,250
12,293,467
7,312,641
$2,287,302
286,250
31,923,642
22,287 .502
3286,250
$40,201,642
2,611,329
8,278,000
Part Il] of Contract Modification No. 16 is
Job I - Engineering, Design, Inspectton, and Construction.
The contractor will b2 required to
perform services for this portion of
Job ! under this contract, the amount
0, some of which are undeterminable
at tnis time. However, the value of
services under this ttem will be determined by the estimaied cost reflected oy the ‘Curreni Esitmuie’. The
term ‘Current Estimate’ as used here-
in is understood to mean the detailed
estimate prepared from detailed final
drawings which have been approved
by the Field Manager, Eniwetok Field
Office, and ts prepared at the time
such drawings are transmitted to the
Jobsite for construction.
‘Current
Estimates’ wi!l be checked by the Eni-
wetok Field Office for accuracy and
upon formal approval will be considered a portion of the scope of work to be
added to the incremental scale set
forth below and will be added to the
contract by modification. Fixed fees
have been estaolished to cover engineering, design, inspection, and construction which may be authorized
during the period October 1, 1352 ta
March 31 1954. Any construction pro-
jects authorized by the Government
subsequent to March 31, 1954 will be
considered new scope of work and wiil
Page 1-32
$ 7,306,205
679,380
included hercir to provide an understanding of
the basis for fee payments.
+
Total
8,278,G00
$36,901,115
“A
Equipment
Not Included
In Const.
not be considered an additive to the
established fee schedule
Estimated costs shown for all
items set forth in Job I under Part I
of the Appendix tn Modification No.
16 are considered firm except Items
27, 29 and 33 which are sn noted.
Payments will be made on a percentage of completion of construction
applied against the fee set farth in the
latest modification for Job I Engineering, Desiyn, Inspection, and Con-
struction, such fee tn be computed
from the fee scale set forth.
Job I - Procurement
Payments of fee for Job I - Procurement will be made on a percentage of completion of procurement services applied against the fee set forth
for that portion of Job I.
AF a BN aeNerd Deer ek
Operation
Castle
Job I - Special Enginecring Report
Payment of fee for Job I - Special
Engineering Reports will be made upon request of the Contractor upon
completion of the report.
Jobs II, 1H, IV, and VY - Camp Op-
eration, Maintenance, Support, and
Roll-up
Payments of fee for Camp Operation, Maintenance, Support, and
Roll-up services are to be made in
twelve equal payments, ‘he first pay-
ment to be made in duly 1953, and ,
‘a