3: pec. 59, J-10 Report: Skumanich, the LASL member of the Sree Steering ° Committee, reports on the 10 to 11 Dec. meeting of that committee, at which the plans program at to terminate and phase out the activities of the underground NTS were announced. B Y The phase out is to take place from 1 Jan. to 7 Mar. of 1960. Livermore people involved.are going to. mave jato the area of high altitude studies (detection?) and Sandia also is terminating their experiment of measuring the bomb temperature and X-ray spectrum, which is apparently 7% to be taken over in some sense by Lockheed. program is to be mothballed after the "The present calibration experiments (of detector systems, etc.) are completed within the next six months. This means tunnel, vacuum pipe, observing stations, detectors, scopes, etc., to be placed on the shelf for future six month readiness. Whether the same contractors would do the_unhypkenedmothballing is left as a future problem." As for the interium status of the program like a compestent Faller. to fugrter. civilian technical then, nothing was decided and it looks director must be found is the program is not : Mention is also made of a large high explosive program which will be funded by the military and is to study X-ray effects.

Select target paragraph3