‘here are three memoranda from Bob Newman of J-6 to Ogle on various aspects of
tonteaining and testing underground which were written in July ana August of 59.
TS
the first of these, July 59, #36-8241, is subject ‘mentativeandsProposed operational
*rocedure for Firing in 1100 Foot deep holes."
It is a plan of attack for 1100 foot
‘ercical holes which will have Alpha neasurments and quicliv recoverable radio chemical
amples and would be almost completely back-filled.
The paper described the configuration
n great detail including dimensions as well as the operational sequence for instrumenting
nd executing the test, as well as a brief recovery procedure.
It noted that there are
‘et unsolved problems in the area of both the Alpha and the Radkem measurments
omments are solicited.
shot in Operation Willow
ded a
er separate cover letter forwar
und
.
up
gro
dy
.
stu
the
,
1959
y
7 Jul
0manareeren
" to the
ation of Eniwetok proving ground
eport on future status .and utiliz
General
ense (Atomic Energy) and the
sistant to the Secretary of Def
s fong,
r of the report, about 165 page
inager of the AEC. The remainde
on Eniwetok.
ntains this sub-committee's report
|
BO
This concludes the notes
re test operations organization.
1 this study group's report on futu
men points oN
AEC in Las Vegas, New
of
ner
Hoh
to
man
New
m
fro
8 July 59 letter
In an ORG
at thd
for balloon use
20,000 feet of coax cab le
e
cur
pro
to
n
ive
nug
bee
approval h as
upported —
f coax that will be uns
nt for these
eme
uir
req
ic
bas
the
tes
He sta
0 feet.
and possibly as long as 120
inimum lengths of 500 feet