pres .vi MATERIAL REMOVED Summary of Special Mission MISSION: Wilson 1, "ROMEO" Shot Sampler DATE: 27 March 1954 CREW: A/ IP P cP N N WF ET R CE 1. BRIEFING: a, Crew attended T.G. 7.4 general briefing at 1100 hours, 26 March 1954. The WRECEP specialized briefing followed at 1330 hours, All details of the mission were covered, : 2. PRE-~MISSION ACTIVITIES: a. Aircraft 2195 was pre-flighted and personal equipment loaded” immediatcly after the 0730 roll call, 2000 hours, Pressure check wes performed at | The aircraft was loaded with 5400 gallons of fucl, sinag it was estimated that 4590 gallons would be required for the estimated 84 40 total flight time. IF~4 in-flight lunches obtained from our Personal Equipment Section were also loaded aboard the aircraft in lieu of box or bulk lunches, b. schedule; Take-off was scheduled for 0140 hours. (1) At Mess: (2) At Orderly Room: (3) Start Engines: This was our airerew 2220 2305 0110 c. Capt Rose distributed two (2) film badges to each crow member dad. The stand-by crew hd the Colerzn tractor attached to the stand-~ at the informal crew briefing. by aircraft; C-21A external power unit plugged in; before starting checklist completed; and wore monitoring our VHF transmissions to Fred Tower before we started our engines, Thcy remained in this status until our aircraft had leveled off at 10,000' cruising altitude, after which they left the aircraft to stand-by in the WRECEP headquarters building until H-1 hour (0530), ALIA 44 oe

Select target paragraph3