ATD OF A/C TIME RECEIVED TIME DISPATCHED DELAY BETWEEN BYCOMM, CENTER COMM, MSG 070158Z 0820352 0920432 1018242 1020172 1102422 1120482 1207322 1419472 1423542 1520452 1605032 0702012 0820572 0920462 1018362 1020262 110256Z 1120512 1207424 1419512 1500012 1520552 1605222 0702222 0821422 0921222 1018402 1020282 1103092 1120592 1208332 1420032 1500082 1521012 1605322 24 Min. 1 Hr. O7 Min. 39 Min. 16 Min. 11 Min. 27 Min. 1l Min, 1 Hr. Ol Min, 16 Min. 14 Min. 16 Min, 29 Min. 1720032 1810532 1814252 1920002 1720112 1810502 1814362 1920012 1720162 1811072 1814412 1920292 i 1620342 covered. 1620452 e, 1620502 16 Min, 13 14 16 29 Min. Min. Min. Min. Longest delay was 1 hour and 7 minutesfor the period 7 Reason given was that work load at times made it impossible to dispatch message any sooner. f. ‘ =D All messages are relayed through Kwajalein by teletype. (1) Load messages are given a precedence of "operations (2) In the event of a circuit outage, all "operations immediate" messages are transmitted to Kwajalein immediate", by CW. ge Holmes and Narver load messages: (1) Information was received that Holmes and Narver load messages were being received promptly at Hickam whereas our load messages were delayed. (2) No reason for this could be determined from this facility, however, it should be noted that H & N messages are transmitted through the communications facilities at JTF-7 on "ELMER", h. Conclusions: (1) Communications traffic is being conducted in (2) Mcssages are being handled. expeditiously, accordance with current regulations and directives, iting «

Select target paragraph3